Exhibit A
<br />40 -42nd Avenue S Phase III Project Bid Tabulation
<br />Unexpected Site Changes
<br />1
<br />FA
<br />Active Construction
<br />Bid Item
<br />No.
<br />Item Description
<br />Quantity
<br />Unit
<br />$ 10,000.00 $ 10,000.00
<br />Unit Price
<br />T
<br />Total Price
<br />B23
<br />PSIPE, THUJA PLICATA ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B24
<br />PSIPE, TSUGA HETEROPHYLLA ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B25
<br />PSIPE, ALNUS RUBRA ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B26
<br />PSIPE, ACER CIRCINATUM ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B27
<br />PSIPE, ACER MACROPHYLLUM ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B28
<br />PSIPE, PSEUDOTSUGA MENZIESII ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B29
<br />PSIPE, PINUS CONTORTA ( #3)
<br />4
<br />EA
<br />$
<br />30.00
<br />$
<br />120.00
<br />B30
<br />PSIPE, CORNUS SERICEA ( #3)
<br />21
<br />EA
<br />$
<br />30.00
<br />$
<br />630.00
<br />B31
<br />PSIPE, SAMBUCUS RACEMOSA ( #3)
<br />21
<br />EA
<br />$
<br />30.00
<br />$
<br />630.00
<br />B32
<br />PSIPE, MYRICA CALIFORNICA ( #3)
<br />21
<br />EA
<br />$
<br />30.00
<br />$
<br />630.00
<br />B33
<br />PSIPE, RIBES SANGUINEUM ( #3)
<br />23
<br />EA
<br />$
<br />30.00
<br />$
<br />690.00
<br />B34
<br />PSIPE, HOLODISCUS DISCOLOR ( #3)
<br />24
<br />EA
<br />$
<br />30.00
<br />$
<br />720.00
<br />B35
<br />PSIPE, SYMPHORICARPOS ALBUS ( #3)
<br />21
<br />EA
<br />$
<br />30.00
<br />$
<br />630.00
<br />B36
<br />Temporary Irrigation System
<br />1
<br />LS
<br />$
<br />16,500.00
<br />$
<br />16,500.00
<br />B37
<br />Settlement Monitoring
<br />1
<br />LS
<br />$
<br />10,000.00
<br />$
<br />10,000.00
<br />B38
<br />Remove and Reset Streambank Boulders
<br />1
<br />LS
<br />$
<br />-3,000.00$
<br />CY
<br />3,000.00
<br />B39
<br />Fish Exclusion
<br />1 I
<br />FA
<br />$
<br />1,000.00
<br />$
<br />1,000.00
<br />575.00
<br />$
<br />Subtotal Schedule B
<br />$
<br />787,508.00
<br />i- ullauulC .. -- rower anu Commumcaiions unaerarounninn
<br />C1
<br />Unexpected Site Changes
<br />1
<br />FA
<br />$ 15,000.00 $ 15,000.00
<br />C2
<br />Franchise Utility Coordination
<br />1
<br />FA
<br />$ 10,000.00 $ 10,000.00
<br />C3
<br />Utility Potholing
<br />1
<br />FA
<br />$ 15,000.00 $ 15,000.00
<br />I W 11L vnnnunit:auvns WMAL "K
<br />C4
<br />Structure Excavation Class B Incl. Haul for Joint Trench
<br />2200
<br />CY
<br />$
<br />65.50
<br />$
<br />144,100.00
<br />C5
<br />Shoring or Extra Excavation Class B for Joint Trench
<br />24000
<br />SF
<br />$
<br />0.30
<br />$
<br />7,200.00
<br />C6
<br />Joint Trench Pipe Zone Bedding, Including Haul
<br />400
<br />CY
<br />$
<br />38.30
<br />$
<br />15,320.00
<br />C7
<br />Joint Trench Backfill
<br />1520
<br />CY
<br />$
<br />49.30
<br />$
<br />74,936.00
<br />C8
<br />Install 444- LA Vault - Comcast
<br />18
<br />EA
<br />$
<br />1,200.00
<br />$
<br />21,600.00
<br />C9
<br />Install Conduit Pipe 4 In. Diam. - Comcast
<br />5300
<br />LF
<br />$
<br />4.00
<br />$
<br />21,200.00
<br />C10
<br />Conduit Riser, 4 -inch - Comcast
<br />4
<br />EA
<br />$
<br />1,175.00
<br />$
<br />4,700.00
<br />C11
<br />Install -11730H Handhole - CenturyLink
<br />8
<br />EA
<br />$
<br />575.00
<br />$
<br />4,600.00
<br />C12
<br />Install 264 -TA - CenturyLink
<br />4
<br />EA
<br />$
<br />500.00
<br />$
<br />2,000.00
<br />C13
<br />Install Conduit Pipe 4 In. Diam. - CenturyLink
<br />3550
<br />LF
<br />$
<br />4.00
<br />$
<br />14,200.00
<br />C14
<br />Core Drill of Existing Vault - CenturyLink
<br />14
<br />EA
<br />$
<br />250.00
<br />$
<br />3,500.00
<br />C15
<br />Install 444 -LA Vault - Zayo
<br />3
<br />EA
<br />$
<br />1,200.00
<br />$
<br />3,600.00
<br />C16
<br />Install Conduit Pipe 4 In. Diam. - Zayo
<br />1550
<br />LF
<br />$
<br />4.00
<br />$
<br />61200.00
<br />15%.L. mucmcai uucibanK
<br />C17
<br />Structure Excavation Class B Incl. Haul for SCL Duct Bank
<br />3080
<br />CY
<br />$
<br />60.00
<br />$
<br />184,800.00
<br />C18
<br />Shoring or Extra Excavation Class B for SCL Duct Bank
<br />28000
<br />SF
<br />$
<br />1.50
<br />$
<br />42,000.00
<br />C19
<br />Handhole, 233 -LA - SCL
<br />3
<br />EA
<br />$
<br />2,850.00
<br />$
<br />8,550.00
<br />C20
<br />Vault, 444 -LA - SCL
<br />6
<br />EA
<br />$
<br />3,700.00
<br />$
<br />22,200.00
<br />C21
<br />Vault, 507 -LA - SCL
<br />3
<br />EA
<br />$
<br />4,350.00
<br />$
<br />13,050.00
<br />C22
<br />Vault, 577 -LA - SCL
<br />7
<br />EA
<br />$
<br />6,650.00
<br />$
<br />46,550.00
<br />C23
<br />Vault, 712 -LA - SCL
<br />1
<br />EA
<br />$
<br />14,500.00
<br />$
<br />14,500.00
<br />C24
<br />Vault, 712 -CLX -SCL
<br />2
<br />EA
<br />$
<br />14,500.00
<br />$
<br />29,000.00
<br />C25
<br />Vault, Pad 10 - SCL
<br />1
<br />EA
<br />$
<br />2,150.00
<br />$
<br />2,150.00
<br />C26
<br />Conduit, PVC, 4 Inch - SCL
<br />12250
<br />LF
<br />$
<br />10.00
<br />$
<br />122,500.00
<br />C27
<br />Conduit, Fiberglass, 5 Inch -SCL
<br />6960
<br />LF
<br />$
<br />15.50
<br />$
<br />107,880.00
<br />C28
<br />Conduit Bend, RGS, 4 Inch, Misc. Degree, 144" or 150" Radius - SCL
<br />150
<br />EA
<br />$
<br />650.00
<br />$
<br />97,500.00
<br />C29
<br />Conduit Bend, RGS, 4 Inch, Misc. Degree, 48" Radius - SCL
<br />3
<br />EA
<br />$
<br />350.00
<br />$
<br />1,050.00
<br />C30
<br />Conduit Riser, 4 -inch
<br />8
<br />EA
<br />$
<br />1,500.00
<br />$
<br />12,000.00
<br />C31
<br />Conduit Riser, 5 -inch
<br />4
<br />EA
<br />$
<br />1,500.00
<br />$
<br />6,000.00
<br />C32
<br />Core Drill of Existing Vault - SCL
<br />14
<br />EA
<br />$
<br />250.00
<br />$
<br />3,500.00
<br />C33
<br />High Strength -FTB - SCL
<br />390
<br />CY
<br />$
<br />150.00
<br />$
<br />58,500.00
<br />C34
<br />Low Strength -FTB - SCL
<br />2626
<br />CY
<br />$
<br />185.00
<br />$
<br />485,810.00
<br />C35
<br />Guard Post (Bollard)
<br />2
<br />EA
<br />$
<br />575.00
<br />$
<br />1,150.00
<br />rnvate service .mint uawry i rencn
<br />C36
<br />Install Conduit Pipe 2 In. Diam. - Comcast Private Service
<br />1820
<br />LF
<br />$
<br />4.00
<br />$
<br />7,280.00
<br />C37
<br />Install Conduit Pipe 2 In. Diam - Century Link Private Service
<br />1750
<br />LF
<br />$
<br />4.00
<br />$
<br />7,000.00
<br />C38
<br />Conduit Pipe 3 In. Diam - Seattle City Light Private Service
<br />1930
<br />LF
<br />$
<br />10.00
<br />$
<br />-
<br />19,300.00
<br />C39
<br />Private Service Address 15857
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C40
<br />Private Service Address 15837
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C41
<br />Private Service Address 15827
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C42
<br />Private Service Address 15819
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C43
<br />Private Service Address 4066
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C44
<br />Private Service Address 15645
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C45
<br />Private Service Address 15625
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C46
<br />Private Service Address 15603
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C47
<br />Private Service Address 15854
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C48
<br />Private Service Address 15838
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C49
<br />Private Service Address 15826
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C50
<br />Private Service Address 15820
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C51
<br />Private Service Address 15660
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C52
<br />Private Service Address 15654
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />C53
<br />Private Service Address 15650
<br />1
<br />LS
<br />$
<br />4,000.00
<br />$
<br />4,000.00
<br />City of Tukwila
<br />42nd Ave S - Phase III Bid Tab
<br />Page 3 of 4 57