TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:51:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.8 Hard Surface Removal and Restoration Costs: Hard surface removal and restoration within <br />City Light trenching and vault excavation limits of Schedule B work shall be Tukwila's <br />responsibility. A hard surface similar to existing conditions within said construction limits <br />will be required until such time that repaving, resurfacing and installing new sidewalks as <br />a component of the overall Project improvements is to occur._City Light shall promptly <br />notify Tukwila if City Light discovers a need for hard surface removal and restoration <br />outside the limits of Schedule B work area, so that appropriate_change orders to the Project <br />contract can be made to complete such work. <br />1.9 Sequencing of Conversion Work: City Light's most efficient sequencing for overhead to <br />underground relocation and installation work such as this Project is to begin electrical work <br />only after all Civil Infrastructure design and construction is completed and accepted. In the <br />event the Civil Infrastructure work is substantially complete before the date City Light is <br />to begin its electrical infrastructure installation work (the "Electrical Work ") in accordance <br />with the Project Schedule, City Light agrees to begin the Electrical Work within 20 <br />working days following its receipt of notice from Tukwila that the site is ready for such <br />work to proceed and Civil Infrastructure has been accepted in writing by the City Light <br />Inspector and City Light Project Manager ( "Operational Acceptance "). In the event that <br />the Electrical Work is delayed beyond the date set forth in the most current and approved <br />Project Schedule, because Tukwila's contractor has not completed the Civil Infrastructure, <br />City Light agrees that it will begin the Electrical Work as soon as possible, but in no event <br />more than thirty (30) working days after receiving notice from Tukwila that the Civil <br />Infrastructure is complete and ready for City Light to proceed, and has been inspected and <br />received written Operational Acceptance from City Light. Nothing herein shall prevent <br />City Light and Tukwila from agreeing to a schedule for commencement of Electrical Work <br />in phases prior to completion of all Civil Infrastructure Work. <br />1.10 Protection of Existing Underground Facilities for Culvert Replacement Work: City Light <br />is responsible for protecting its existing underground electrical distribution system during <br />the Culvert Replacement Work that will be performed by Tukwila. City Light, in <br />coordination with other utilities using the existing shared duct bank, will obtain, install, <br />and pay for their share of a system to protect the existing duct bank during the Culvert <br />Replacement Work. Tukwila shall be fully responsible for all other aspects of the Culvert <br />Replacement Work. City Light shall coordinate the protection of its underground electrical <br />distribution system with Tukwila and the Civil Infrastructure work. City Light in its sole <br />discretion may elect to remove and replace its ductbank during the Culvert Replacement <br />Work. <br />Section 2. Definitions <br />The following terms are defined here as they are used in this Agreement: <br />"Aerial Electrical System ": The overhead electrical distribution system and service drops, <br />including but not limited to cables, connections, terminations, transformers, switches, <br />utility poles, and associated components. <br />City of Tukwila - 42nd Ave S Phase III Undergrounding Agreement <br />Page 4 of 17 41 <br />FINAL <br />