City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:51:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"Aerial Infrastructure Removal Project ": The removal of the existing City Light Aerial <br />Electrical System in the Conversion Area. <br />"Bid Documents ": Engineering design plans including those for Civil Infrastructure PS &E <br />(definition stated below), Project specifications, bidder's forms, and certificates, bid <br />contract documents, required contract provisions for Federal -Aid construction contracts if <br />applicable, unit price bid schedule for all Schedules A -E. <br />"City Light Civil Infrastructure Engineering Guidelines ": The most current engineering <br />guidelines, construction guidelines, materials standards, and engineering operations and <br />practices adopted by SCL that govern the design, location, alignment, depth, materials, and <br />engineering specifications determined by SCL in its sole discretion that apply to Civil <br />Infrastructure associated with the Underground Electrical System. <br />"Civil Infrastructure ": Underground infrastructure necessary to contain and facilitate City <br />Light's Underground Electrical System, including but not limited to conduit, ducts, duct <br />banks, vaults, handholds, casing, and other non - energized electrical facilities, as described <br />in Schedule C, SCL Electrical Ductbank. Civil infrastructure does not include the <br />Underground Electrical System or infrastructure and facilities related to the Culvert <br />Replacement Work. <br />"Civil Infrastructure Plans, Specifications, and Estimates or Civil Infrastructure (PS &E) ": <br />Engineering design plans that include Civil Infrastructure work, Washington State <br />Department of Transportation and Seattle City Light Standard Specifications and Details, <br />and construction cost estimates. <br />"Consultant ": The City of Tukwila's consultant, CH2M Hill, Inc. <br />"Contractor ": Selected contractor from bidding process. Selected contractor is responsible <br />for all subcontracted work. <br />"Conversion Area ": The 42nd Avenue S corridor in Tukwila, Washington from <br />Southcenter Boulevard to S 160th Street, including parcels served by the electrical <br />distribution system along this corridor. <br />"Culvert Replacement Work ": Replacement of a failing 36 -inch pipe culvert with a new <br />fish passible culvert for Gilliam Creek as it passes underneath 42nd Avenue S as defined in <br />Schedule B of the Bid Documents. The City of Tukwila is responsible for the design and <br />construction of the Culvert Replacement Work. Relocation of utilities within Tukwila <br />owned right -of -way are the responsibility of the utility owner in accordance with RCW <br />35.99.060. <br />"Electrical Work ": The installation of the Underground Electrical System within the <br />completed Civil Infrastructure following Operational Acceptance by City Light. <br />"Field Directive Change(s) ": Design changes to agreed -upon "Work" as the result of field <br />conditions. <br />City of Tukwila - 42nd Ave S Phase III Undergrounding Agreement <br />Page 5 of 17 42 <br />FINAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.