City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2E - Agreement - 42nd Avenue South Phase III with Seattle City Light
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:51:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
"Underground Electrical System ": The underground electrical distribution system and <br />underground service lines, including but not limited to cables, connections, terminations, <br />transformers, switches, and associated components. <br />"Underground Relocation and Installation Project ": The design, construction, and <br />installation of the Underground Electrical System within the Conversion Area. <br />"Work ": The work to be performed under this Agreement, including the Civil <br />Infrastructure Work, the Underground Relocation and Installation Project, the Electrical <br />Work, and energizing of the Underground Electrical System, and the Culvert Replacement <br />Work. <br />Section 3. Design Development and Review Process <br />3.1 City Light will, in accordance with Section 3.4 of this Agreement, provide Tukwila and <br />the Consultant with the City Light Civil Infrastructure Engineering Guidelines which <br />Tukwila and the Consultant will use to prepare and complete the Civil Infrastructure PS &E. <br />Tukwila shall provide the basic layout of the Civil Infrastructure, including conduit and <br />vault layout, conduit duct details, vault and hand hole details, and engineering <br />specifications for the material in accordance with City Light Civil Infrastructure <br />Engineering Guidelines. City Light will make its staff reasonably available to Tukwila and <br />the Consultant to facilitate the completion of the Civil Infrastructure PS &E. <br />3.2 Upon execution of this Agreement, City Light will furnish Tukwila with a list of Third <br />Party renters whom have facilities on City Light's poles within the Conversion Area. <br />Tukwila will be responsible for communicating the need to relocate these facilities with <br />each Third -Party renter, and coordinating with each renter for the relocation and <br />undergrounding, or removal without relocation of the renter's facilities and equipment. <br />City Light will provide notice to each Third -Party renter of the need to remove facilities <br />pursuant to any such agreements, rules or regulations City Light has that are applicable to <br />such Third -Party renters. City Light will, in accordance with Section 6.3.3. of this <br />Agreement, cooperate with and assist Tukwila in Tukwila's efforts to facilitate the <br />relocation of the facilities of the pole renters attached to City Light's Aerial Electric System <br />and completion of the Third -Party Aerial Infrastructure Removal Project, including to the <br />extent necessary using legal authority City of Tukwila and City Light has under any such <br />agreement, franchise agreement, ordinances, rules or regulations that are applicable to such <br />Third -Party renters. <br />3.3 Tukwila shall be responsible for completion of the Civil Infrastructure PS &E. The <br />Consultant will coordinate with a designated City Light staff person to ensure that the Civil <br />Infrastructure PS &E incorporates appropriate specifications and detail that conform to City <br />Light Civil Infrastructure Engineering Guidelines. City Light will be responsible for the <br />detailed electric design of the Underground Electrical System and any design work <br />necessary to complete the Aerial Infrastructure Removal Project. <br />3.4 The Civil Infrastructure PS &E must meet City Light Civil Infrastructure Engineering <br />Guidelines, using materials in accordance with City Light material standards included <br />therein. City Light shall provide Tukwila with the Civil Infrastructure Engineering <br />City of Tukwila - 42 "d Ave S Phase III Undergrounding Agreement <br />Page 7 of 17 <br />FINAL <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.