Laserfiche WebLink
EXHIBIT E -1 <br />KPFF Consulting Engineers <br />CONSULTANT FEE DETERMINATION <br />SUMMARY OF COST <br />Tukwila Urban Center Package #1: Baker & Christensen Improvements <br />Classification <br />Total Hours <br />X <br />Rate = <br />Cost <br />Principal <br />2.00 <br />X <br />$65.00 = <br />$130.00 <br />Project Manager <br />60.00 <br />X <br />$60.00 = <br />$3,600.00 <br />Project Engineer <br />62.00 <br />X <br />$50.00 = <br />$3,100.00 <br />Sr Const Manager <br />0.00 <br />X <br />$55.00 = <br />$0.00 <br />Const Manager <br />90.00 <br />X <br />$40.00 = <br />$3,600.00 <br />Senior Inspector <br />536.00 <br />X <br />$37.00 = <br />$19,832.00 <br />Field Inspector <br />0.00 <br />X <br />$30.00 = <br />$0.00 <br />CADD Technician <br />10.00 <br />X <br />$36.00 = <br />$360.00 <br />Coordinator / Admin <br />82.00 <br />X <br />$29.00 = <br />$2,378.00 <br />DSC Subtotal <br />$33,000.00 <br />Overhead (OH) Cost <br />OH Rate x DSC of <br />137.52% <br />X <br />$33,000.00 <br />$45,381.60 <br />Fixed Fee (FF) <br />FF Rate x DSC of <br />30.00% <br />X <br />$33,000.00 = <br />$9,900.00 <br />Reimbursables <br />Mileage (1800 Miles x $0.565 /mile) $1,017.00' <br />Reprographics ( ## Sheets x $X.xx/sheet) <br />Subcontract; (Sub Name & Task) <br />Materials Testing Agency; (Allowance) $20,000.00 <br />Subtotal $21,017.00 <br />Subconsultant Costs (See Exhibit G) <br />$10,382.38 <br />GRAND TOTAL: $119,680.98 <br />15 <br />