City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2B - Contract Supplement #17 - Baker Boulevard Non-Motorized Improvements with Icon Materials
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2B - Contract Supplement #17 - Baker Boulevard Non-Motorized Improvements with Icon Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:53:10 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT G -1 <br />KPG <br />CONSULTANT FEE DETERMINATION <br />SUMMARY OF COST <br />Tukwila Urban Center Package #1: Baker & Christensen Improvements <br />Classification <br />Senior E /LA <br />Project E/S <br />LA/Eng <br />Design Technician <br />Survey Crew <br />Office Admin. <br />Overhead (OH) Cost <br />OH Rate x DSC of <br />Fixed Fee (FF) <br />FF Rate x DSC of <br />Reimbursables <br />Mileage <br />Reprographics <br />Subcontract <br />(Blank) <br />Subtotal <br />Total Hours X Rate = Cost <br />20.00; <br />X <br />$56.97 = <br />$1,139.40; <br />30.00; <br />X <br />$44.59 = <br />$1,337.70: <br />30.00'; <br />X <br />$40.38 = <br />$1,211.40 <br />8.00 <br />X <br />$26.44 = <br />$211.52 <br />0.00 <br />X <br />$47.12 = <br />$0.00 <br />0.00 <br />X <br />$31.25 = <br />$0.00 <br />0.00 <br />X <br />= <br />$0.00 <br />0.00 <br />X <br />= <br />$0.00 <br />DSC Subtotal <br />$3,900.02 <br />136.21% X <br />30.00% X <br />$3,900.02 <br />$3,900.02 <br />( ## Miles x $0.565 /mile) <br />( ## Sheets x $X.xx/sheet) <br />(Sub Name & Task) <br />(Allowance) <br />_ $5,312.35 <br />$1,170.01 <br />$0.00 <br />Subconsultant Total: $10,382.38 <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.