Laserfiche WebLink
EXHIBIT G -1 <br />KPG <br />CONSULTANT FEE DETERMINATION <br />SUMMARY OF COST <br />Tukwila Urban Center Package #1: Baker & Christensen Improvements <br />Classification <br />Senior E /LA <br />Project E/S <br />LA/Eng <br />Design Technician <br />Survey Crew <br />Office Admin. <br />Overhead (OH) Cost <br />OH Rate x DSC of <br />Fixed Fee (FF) <br />FF Rate x DSC of <br />Reimbursables <br />Mileage <br />Reprographics <br />Subcontract <br />(Blank) <br />Subtotal <br />Total Hours X Rate = Cost <br />20.00; <br />X <br />$56.97 = <br />$1,139.40; <br />30.00; <br />X <br />$44.59 = <br />$1,337.70: <br />30.00'; <br />X <br />$40.38 = <br />$1,211.40 <br />8.00 <br />X <br />$26.44 = <br />$211.52 <br />0.00 <br />X <br />$47.12 = <br />$0.00 <br />0.00 <br />X <br />$31.25 = <br />$0.00 <br />0.00 <br />X <br />= <br />$0.00 <br />0.00 <br />X <br />= <br />$0.00 <br />DSC Subtotal <br />$3,900.02 <br />136.21% X <br />30.00% X <br />$3,900.02 <br />$3,900.02 <br />( ## Miles x $0.565 /mile) <br />( ## Sheets x $X.xx/sheet) <br />(Sub Name & Task) <br />(Allowance) <br />_ $5,312.35 <br />$1,170.01 <br />$0.00 <br />Subconsultant Total: $10,382.38 <br />16 <br />