City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-07-25 Item 2B - Contract Supplement #17 - Baker Boulevard Non-Motorized Improvements with Icon Materials
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-07-25 Transportation and Infrastrcuture
>
TIC 2017-07-25 Item 2B - Contract Supplement #17 - Baker Boulevard Non-Motorized Improvements with Icon Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:51 PM
Creation date
7/20/2017 9:53:10 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
07/25/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 5 <br />Task No. 3.20 - Requests for Information (RFI) <br />Consultant Team shall assist the City in review and response to Contractor Requests <br />for Information for design clarifications. Project Manager will log and track all RFIs, <br />coordinate with the City for response /clarification by City staff, and forward all <br />submittals that cannot be reviewed and approved by City to the Consultant Design team <br />for review. Effort related to this item is assumed to be a maximum of 15 items <br />forwarded for review. <br />Effort related to this item is assumed to be a maximum of 15 RFI items forwarded for <br />review, comment, and clarification. <br />Task No. 3.30 - Design Modifications and Plan Revisions (RFI) <br />Consultant Team shall prepare Plan revisions as a result of RFIs from unforeseen <br />conditions and utility conflicts. <br />Effort related to this item is assumed to be a maximum of 4 design modifications and <br />clarifications. <br />Deliverables <br />• Submittal review of 30 items <br />• 15 responses to Request for Information <br />• 4 Plan revisions as a result of RFI issues, unknown field conditions, or utility <br />conflicts. <br />Assumptions <br />II. Budget: <br />A. Staffing levels are anticipated in accordance with the attached budget estimate. <br />Consultant services are budgeted for fulltime inspection for 40 working days, <br />and part time (3 full -time days per week) for 40 working days, from August 2017 <br />through November 2017. This is intended to span the contract construction <br />duration of 80 working days. Project closeout will be performed by the City with <br />Consultant staff providing support as needed for that effort. Overtime has not <br />been figured into the budget. <br />B. Consultant will work up to the limitations of the authorized budget. If additional <br />budget is needed to cover such instances as the following, City and Consultant <br />will negotiate a supplement to this Agreement: <br />1. The Contractor's schedule requires inspection coverage of extra crews <br />and shifts. <br />11 <br />