City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-09-12 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-09-12 Transportation and Infrastructure
>
TIC 2017-09-12 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:52 PM
Creation date
9/7/2017 1:02:09 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/12/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ► Change Management <br />Project Managers from CLIENT and CONSULTANT are responsible for managing changes to the scope and <br />schedule. CLIENT is responsible for the authorization of any changes to the scope, budget, and/or <br />schedule, Team members must ensure that work within their areas remains within the defined project <br />scope, schedule, and budget. When issues, actions, or circumstances occur that could cause a change in <br />scope, personnel, cost, or schedule, team members must communicate potential changes to the Project <br />Manager as early as possible. Project Managers will determine whether the potential change issue will <br />lead to a change in scope, cost, or schedule. <br />CONSULTANT shall obtain written authorization from CLIENT before implementing any change to this <br />Scope of Services, schedule, or budget, All changes will be documented using the Project Change Form, <br />3.1 Field Review <br />CONSULTANT will conduct an existing water system maps/GIS review at the outset of the project to <br />identify key field conditions that may impact the field mapping including safety, traffic and access issues. <br />The procedures required to complete the field survey will be determined and safety risks will be analyzed. <br />3.2 luta Collection <br />CONSULTANT will field survey the location of water system point features and water system utility paint <br />locates south of Interstate 405 within the City of Tukwila retail water service area. Field notes will be <br />collected to support project deliverables. Pipe connections will be completed in the field where practical. <br />CONSULTANT will use CLIENT agreed upon GIS database structure, <br />3.3 Water System As -wilt Research <br />CONSULTANT will review research on existing utility information, provided by CLIENT, for inclusion in the <br />mapping. Where possible CONSULTANT will use provided as -built records to prepare and pre -enter system <br />information to be field verified. This will make the field effort more efficient. <br />3.4 Ueodatabase Update <br />CONSULTANT will utilize its field surveyed information, and the as -built research to create the <br />Oeodatabase CIS files. <br />CONSULTANT will include metadata for the Geodatabase updates. <br />Dellvgrables: Electronic copy of the updated Oeodatabase <br />City of Tukwila <br />Water System GIS Inventory <br />Scope of Services- <br />August 24, 2017 <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.