City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
2017-09-26 Transportation and Infrastructure Minutes
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Minutes (2017-Present)
>
2017-09-26 Transportation and Infrastructure Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:38 PM
Creation date
9/29/2017 10:43:08 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/26/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation & Infrastructure Committee Minutes September26, 2017 <br />III. MISCELLANEOUS <br />Construction Project Updates <br />1. S 144th St Phase II <br />Contract is 120 working days and began April 24, 2017 to October 11, 2017. Road closure <br />extended to 8/31/17 with one westbound lane open to traffic. New schedule is that all <br />construction should be completed by October 31, with only the traffic signal continuing into <br />November. Issues with electrical subcontractor, Seattle City Light, and coordination with <br />Tukwila Village. Only one change order to date for Century Link, which will be reimbursed. <br />Contingency at $282k, but may need a construction management supplement due to time <br />delays. We will also have issues with Seattle City Light over additional work. <br />2. 42nd Ave S Phase III <br />This contract began July 24, 2017 and is scheduled for 165 days with a winter shutdown from <br />November 18 to April 6, 2018. Undergrounding is scheduled during the winter work suspension. <br />Completion is currently at August 2018. We have encountered significant soil stuffing at 50% of <br />the 18 -foot excavation level for the Gilliam Creek culvert installation, which will require an <br />extension on the HPA fish window permit. No change orders to date, but a good portion of the <br />$1m contingency could be used for the soil impact and delay due to the culvert replacement. <br />3. TUC Pedestrian/Bicycle Bridge <br />As reported in item 2b, the bridge has been delayed three months and is now scheduled for <br />completion in late November. The bridge deck concrete has been poured and the landings are <br />scheduled to be poured on 10/2/17. Items remaining include; painting, retaining walls, stairs, <br />electrical, and landscaping. There have been only $53k in change orders and with construction <br />management supplements, there is still over $600k remaining in the $942k contingency fund. <br />Committee members and staff spoke briefly on the Valley View Sewer District's improvements to The <br />Loop and the Committee requested that Valley View give an update on their project to full Council. <br />Future TIC agenda item includes an update on the S 160th St Speed Cushion Pilot Program and Committee <br />requested the data on speeds over the summer and costs to implement in other parts of the City <br />The Transportation Committee Meeting adjourned at 6:30 p.m. <br />Committee Chair Approval <br />Minutes by GL, reviewed by BG <br />
The URL can be used to link to this page
Your browser does not support the video tag.