City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-11-14 Item 2A - Grant Acceptance - NPDES: 2017-2019 Biennial Stormwater Capacity Grant from Department of Ecology
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-11-14 Transportation and Infrastructure
>
TIC 2017-11-14 Item 2A - Grant Acceptance - NPDES: 2017-2019 Biennial Stormwater Capacity Grant from Department of Ecology
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:54 PM
Creation date
11/7/2017 4:21:20 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
State of Washington Department of Ecology <br />Agreement No: WQSWCAP-1719-Tukwil-00050 <br />Project Title: 2017-2019 Biennial Stormwater Capacity Grants <br />Recipient Name: City of Tukwila <br />SCOPE OF WORK <br />Task Number: 2 Task Cost: $45,000.00 <br />Task Title: Permit Implementation <br />Task Description: <br />Conduct work related to implementation of municipal stormwater National Pollutant Discharge Elimination System <br />(NPDES) permit requirements. If the RECIPIENT is out of compliance with the municipal stormwater National <br />Pollutant Discharge Elimination System (NPDES) permit, the RECIPIENT will ensure funds are used to attain <br />compliance where applicable. <br />RECIPIENT may conduct work related to implementation of additional activities required by the municipal stormwater <br />NPDES permits. The following is a list of elements RECIPIENT's project may include. <br />1) Public education and outreach activities, including stewardship activities. <br />2) Public involvement and participation activities. <br />3) Illicit discharge detection and elimination (IDDE) program activities, including: <br />a) Mapping or geographic information systems of municipal separate storm sewer systems (MS4s). <br />b) Staff training. <br />c) Activities to identify and remove illicit stormwater discharges. <br />d) Field screening procedures. <br />e) Complaint hotline database or tracking system improvements. <br />4) Activities to support programs to control runoff from new development, redevelopment, and construction sites, <br />including: <br />a) Development of an ordinance and associated technical manual or update of applicable codes. <br />b) Inspections before, during, and upon completion of construction, or for post -construction long-term maintenance. <br />c) Training for plan review and/or inspection staff. <br />d) Participation in applicable watershed planning effort. <br />5) Pollution prevention, good housekeeping, and operation and maintenance program activities, such as: <br />a) Inspecting and/or maintaining the MS4 infrastructure. <br />b) Developing and/or implementing policies, procedures, or stormwater pollution prevention plans at municipal <br />properties or facilities. <br />6) Annual reporting activities. <br />7) Establishing and refining stormwater utilities, including stable rate structures. <br />8) Water quality monitoring to implement permit requirements for a Water Cleanup Plan (TMDL). Note that any <br />monitoring funded by this program requires submittal of a Quality Assurance Project Plan (QAPP) that the <br />DEPARMENT approves prior to awarding funding for monitoring. <br />Monitoring, including: <br />a) Development of applicable QAPPs. <br />b) Monitoring activities, in accordance with a DEPARTMENT- approved QAPP, to meet Phase I/II permit <br />requirements. <br />9) Structural stormwater controls program activities (Phase I permit requirement) <br />10) Source control for existing development (Phase I permit requirement), including: <br />a) Inventory and inspection program. <br />b) Technical assistance and enforcement. <br />c) Staff training. <br />Version 10/30/2015 <br />Page 6 of 19 <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.