Laserfiche WebLink
City of Tukwila <br />Public Works Department - Robin Tischmak, Acting Director <br />Allan Ekberg, Mayor <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Robin Tischmak, Acting Public Works Director <br />BY: Mike Perfetti, Habitat Project Manager <br />DATE: November 9, 2017 <br />SUBJECT: Riverton Creek Flapqate Removal Project <br />Project Number 99830103 <br />Contract 17-070, Amendment No. 1 <br />ISSUE <br />Approve Supplemental Agreement No. 1 to Contract No. 17-070 with OTAK, Inc. <br />BACKGROUND <br />In May 2017, the City entered into a consultant agreement with OTAK, Inc. for design services of the Riverton Creek Flapgate <br />Removal Project. This project will remove two culverts and flap gates where Riverton Creek joins the Duwamish River. A new trail <br />bridge will be installed over the new open channel which should improve fish passage. <br />DISCUSSION <br />Four additional service items have emerged since the OTAK contract was initiated: <br />1. OTAK has determined that the geotechnical investigations and hydraulic modelling were lacking key information needed for <br />the design of the new pedestrian Green River Trail bridge, modifications to the TIB bridge abutment, and channel bank <br />stabilization. <br />2. The City was notified by our funding partner, the State's Recreation and Conservation Office (RCO), that cultural resource <br />review will be required. <br />3. The Salmon Recovery Funding Board recently approved with conditions the City's RCO grant application stating that "this <br />project needs to demonstrate that increasing fish access to Riverton Creek will not increase toxic exposure to salmonids from <br />stormwater inputs...", meaning that additional stormwater water quality modeling is necessary. <br />4. Staff requested that OTAK conduct a brief alternative analysis exercise, and shift budget from other tasks to do so. To <br />partially offset cost increases, staff will take on a handful of items that were previously in the OTAK scope including permit <br />work and landscape design. <br />OTAK is providing a scope of services that includes additional geotechnical exploration, hydraulic modeling, cultural resource <br />investigation, and stormwater modelling. The additional work and completion of the remaining tasks will require additional contract <br />time and Supplemental Agreement No. 1 will extend the time for performance to April 30, 2019. <br />FISCAL IMPACT <br />The current agreement with OTAK is for $105,363.00 and with Amendment No. 1 for $39,993.00, the total contract amount will be <br />$145,356.00. To fund Amendment No. 1, the project will utilize the 2018 CIP construction budget of $200,000. Two pending <br />grants, totaling $846,965.00, are expected to be executed in 2018, which will replace the borrowed City construction funds. <br />Agreement 2017-2018 Budget <br />Original OTAK Contract $105,363.00 $108,00.00 <br />OTAK Amendment #1 39,993.00 200,000.00 <br />$145,356.00 $308,000.00 <br />RECOMMENDATION <br />Council is being asked to approve design Supplemental Agreement No. 1 for $39,993.00 with OTAK, Inc. for the Riverton Creek <br />Flapgate Removal Project and consider this item on the Consent Agenda at the November 20, 2017 Regular Meeting. <br />Attachments: Page 108 of 2017 CIP <br />OTAK Supplemental Agreement #1 <br />W:\PW Eng \PROJECTS \A- DR Projects\Riverton Flap Gate Removal (99830103 98-DR03)\Consultant Selection\Phase 2\contractAmendment #11Info Memo for Supplement #1.docx <br />87 <br />