City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-11-14 Transportation and Infrastructure
>
TIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:55 PM
Creation date
11/7/2017 4:27:31 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: Riverton Creek Flap Gate Removal Project No. 99830103 <br />DESCRIPTION: Remove two culverts and flap gates at Duwamish River; install pipe arch, create open channel confluence, <br />install trail bridge over new channel, restorelrevegetate 200 feet of creek channel and 450 ft. of pond shoreline. <br />JUSTIFICATION: Increase available salmonid rearing habitat and increase flood refuge in lower Duwamish River. Improve <br />fish access to Riverton Creek and enhance salmon rearing and resting area. <br />STATUS: Design at 70% completion in 2011 with a Salmon Recovery Funding Board grant of $42,500 and $30,000 <br />from People for Puget Sound. Construction is grant dependent. <br />MAINT. IMPACT: Expected to increase maintenance. <br />COMMENT: <br />Proposed grants include State & Federal habitat grants. Project used as mitigation for East Marginal Way <br />Pipe Replacement Project and HPA Control#133763-1 requires work to be completed by June 11, 2019. <br />FINANCIAL Through Estimated <br />in $000's <br />2015 2016 2017 <br />2018 2019 2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />Location <br />( <br />m ti <br />Design <br />114 <br />10 <br />108 <br />l <br />s] <br />D- Vry <br />\`\p\\moi <br />I\'\q <br />\S' <br />�l;r <br />Fr <br />232 <br />Land (RM/) <br />0 <br />Const. Mgmt. <br />100 <br />100 <br />Construction <br />650 <br />650 <br />TOTAL EXPENSES <br />114 <br />10 <br />108 <br />750 <br />0 <br />0 <br />0 <br />0 <br />0 <br />982 <br />FUND SOURCES <br />Awarded Grant <br />72 <br />72 <br />Proposed Grant <br />550 <br />550 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />42 <br />10 <br />108 <br />200 <br />0 <br />0 <br />0 <br />0 <br />0 <br />360 <br />TOTAL SOURCES <br />114 <br />10 <br />108 <br />750 <br />0 <br />0 <br />0 <br />0 <br />0 <br />982 <br />CD Project <br />Location <br />( <br />m ti <br />s,n % <br />ut <br />i- <br />s; = <br />s. <br />SiY2 St <br />\� <br />/{GGbSFb <br />_ <br />1 <br />I,n <br />C <br />r'--- [1 <br />I i i III <br />snf Sit215Jt\ <br />4.1 <br />130 St. r <br />a 1 <br />�_ <br />2' '6, <br />l <br />s] <br />D- Vry <br />\`\p\\moi <br />I\'\q <br />\S' <br />�l;r <br />Fr <br />2017 - 2022 Capital Improvement Program <br />108 <br />88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.