Laserfiche WebLink
Exhibit A-1 Scope of Work <br />Continued <br />• Recommendations for earthwork including: <br />o Stripping, removal of soft, organic or other unsuitable material; <br />o Excavation considerations including temporary cut slope inclinations; <br />o Placement and compaction of structural fill; <br />o A discussion on the effects of weather and construction equipment on the site <br />soils; and <br />o A discussion on site drainage and dewatering, if necessary. <br />8. Provide consultation to the design team including reviewing the plans and specifications for <br />conformance to our geotechnical recommendations. <br />W:APW Eng\PROJECTS\A- DR Projects\Riverton Flap Gate Removal (99830103 98-DR03)\Consultant Selection\Phase <br />2\contract\Amendment #1\Riverton SOW_Amend 1_17_1027.docx 6 96 <br />