City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-11-14 Transportation and Infrastructure
>
TIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:55 PM
Creation date
11/7/2017 4:27:31 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A-1 Scope of Work <br />Continued <br />Scope and Budget Modifications <br />Several tasks are forecasted to be under budget or are reduced in scope, which will reduce the <br />budget requirement, and include the following: <br />2.4 Develop Permitting Strategy Plan <br />This task is omitted. The City will lead the permitting effort. Any permitting support, if requested <br />by the City, will be provided under Task 4.7 Permitting Support. <br />3 Coordination Meetings <br />This task is omitted. Otak will facilitate meetings to review assessment of alternatives under new <br />Task 2.5. Any participation of a meeting with permitting agencies, if requested by City, will be <br />provided under Task 4.7 Permit Support. <br />4. I JARPA Preparation <br />The scope for this task is reduced. The City will prepare the Joint Aquatic Resources Permit <br />Application (JARPA) for the project including the preparation of the required drawings. The JARPA <br />and existing Critical Areas Report will be used to apply for and support a Washington State <br />Department of Fish and Wildlife (WDFW) Streamlined Hydraulic Project Approval (HPA) for a fish <br />habitat enhancement project. The City will prepare the complete application and manage the <br />submittal. Otak will provide support and review of the draft application materials, as requested. <br />4.2 Specific Project Information Form (SPIF) <br />The scope for this task is reduced. The City will prepare and submit the Specific Project <br />Information Form (SPIF), per the Programmatic Biological Assessment (PBA) for Restoration <br />Actions in Washington State and associated Biological Opinion (BiOp). Otak will provide support <br />and review of the draft form. <br />4.3 Cultural Resources <br />This task is revised to include a Cultural Resources Assessment by Cultural Resource Consultant <br />(CRC), a subconsultant to Otak. <br />CRC will provide the following project components as part of this cultural resources assessment: <br />• CRC will conduct a search of site files recorded at Washington Department of <br />Archaeology and Historic Preservation (DAHP); review of relevant correspondence between <br />the project proponent, stakeholders and DAHP; and, review of pertinent environmental, <br />W:APW Eng\PROJECTS\A- DR Projects\Riverton Flap Gate Removal (99830103 98-DR03)\Consultant Selection\Phase <br />2\contract\Amendment #1\Riverton SOW_Amend 1_17_1027.docx 7 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.