City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-11-14 Transportation and Infrastructure
>
TIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:55 PM
Creation date
11/7/2017 4:27:31 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A-1 Scope of Work <br />Continued <br />Otak will provide a review of the Specifications Manual at the 90 percent and Final design levels. <br />The City will provide revisions as necessary. <br />Otak will prepare an estimated construction schedule to determine the number of working days for <br />the construction contract, for review by the City at approximately the 90 percent design level. <br />Deliverables: <br />1. Special Provisions at 90 -percent and 100 -percent design (pdf format and MS Word format)., <br />sealed by a Washington state registered PE. <br />2. Estimated construction schedule, draft and final in Microsoft Project (.mpp and .pdf format). <br />5.3 Construction Cost Estimates <br />The scope for this task is reduced as the City will provide quantities and unit costs for all <br />landscaping bid items. <br />Otak Project Expense Budget <br />Expense costs will be significantly less than projected and site visits that will incur mileage costs will <br />be limited. <br />W:APW Eng\PROJECTS\A- DR Projects\Riverton Flap Gate Removal (99830103 98-DR03)\Consultant Selection\Phase <br />2\contract\Amendment #1\Riverton SOW_Amend 1_17_1027.docx <br />10 100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.