City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2017-11-14 Transportation and Infrastructure
>
TIC 2017-11-14 Item 2D - Contract Amendment #1 - Riverton Creek Flapgate Removal Design with OTAK Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:55 PM
Creation date
11/7/2017 4:27:31 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/14/17
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A-1 Scope of Work <br />Continued <br />The preparation of final signed bid set plans and specs is removed from the scope. A final bid set <br />can be prepared later once additional funding has been secured for construction. <br />5. I Final Design and Plans Sheets <br />4 Creek Grading, Trail Restoration, and Bank Armoring Design <br />The scope for final design and plan preparation is revised as the City will perform all landscaping <br />design for revegetation of Riverton Creek and for edge restoration along Green River Trail. The <br />City will provide construction plan sheets for all landscaping features including the placement of <br />Large Woody Debris (LWD). The City will also provide all planting details. Otak will provide the <br />details for LWD. Otak will also provide electronic drawing files for the sheet titleblock and any civil <br />basefiles that the City will need to prepare the landscaping sheets. <br />Otak will revise the grading prepared previously (by others) to allow for channel side slopes with a <br />maximum slope of 1.75'H : 1'V. It is assumed that this proposed slope will be able to be stabilized <br />with a bio -engineered system with components such as LWD, rip -rap, plastic geocell, and <br />biodegradable matting that is compatible with the City's design for slope vegetation. <br />This scope does not include engineering for a mechanically stabilized earth wall or soil nails for <br />channel slope stabilization. <br />6 Retaining Wall Design (3 sheets) <br />The scope for final design and plan preparation is revised to include a retaining wall adjacent to the <br />parking lot with greater vertical and horizontal extents. It is assumed that this wall will be a <br />reinforced concrete retaining wall. <br />A computer -modeled visualization is omitted from the scope. <br />5.2 Specifications <br />The scope for this task is reduced as the City will lead the preparation of the master Contract <br />Manual and the preparation of landscaped Special Provisions. Otak will provide General Special <br />Provisions (GSP) and project -specific Special Provisions for Divisions 2 — 9, excluding the <br />landscape and planting Special Provisions. The City will prepare Special Provisions for all landscape <br />and planting work including topsoil, compost, seeding, and plant establishment. <br />The City will prepare Division 1 of the Specifications and compile the master Contract Manual <br />including all Contract and Bid Forms, Amendments to the WSDOT Standard Specifications, and <br />Appendices. The City will incorporate Special Provisions provided by Otak. <br />W:APW Eng\PROJECTS\A- DR Projects\Riverton Flap Gate Removal (99830103 98-DR03)\Consultant Selection\Phase <br />2\contract\Amendment #1\Riverton SOW_Amend 1_17_1027.docx 9 99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.