Laserfiche WebLink
PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />STATUS: <br />CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2019 to 2024 <br />Boeing Access Rd over Airport Way Bridge Seismic Retrofit Project No. 91310407 <br />Provide seismic modifications to the Boeing Access Rd over Airport Way Bridge to allow it to withstand <br />earthquake forces. <br />The Boeing Access Road over Airport Way Bridge is the final bridge from 1-5 to the King County Airport <br />and Boeing facilities that has not been seismically upgraded. This improvement would allow the entire <br />corridor to be seismically resistant during an earthquake. <br />The project is currently in the fund acceptance phase. It is expected to start design in the first quarter of <br />2018 and have construction bids advertised in late 2018. Construction would be in 2019. <br />MAINT. IMPACT: Maintenance will be reduced. <br />COMMENT: <br />FINANCIAL <br />(in $000's) <br />If construction is not authorized by December 2020 t9,Cit %wor,'d e rec, 'ired to provide a 13.5% match. <br />u <br />If construction is authorized prior to that date ^ ?fe 'Quid I`, ro City '17''?. We believe that the project <br />can obtain the construction author(z0,I s'no r tch is stt. ' <br />ThrougI Est ina „d <br />2015 X016 <br />2018 <br />2019 <br />2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />Project Location <br />: 5i <br />0e � 1ati a5m�.o.,.e.wmo <br />yC. <br />y �mb� <br />i B��cces J'.., <br />s— <br />5 <br />I> <br />Design <br />j <br />367 <br />3 <br />a FF S112 St <br />o <br />D <br />y m <br />370 <br />Land(R/W) <br />i <br />✓': <br />e sys <br />a <br />0 <br />Const . Mgmt. <br />DD <br />N as <br />� s <br />a <br />v <br />122 Str ny <br />264 <br />4 <br />o <br />264 <br />Construction <br />b <br />S128 $ <br />2,347 <br />k\ b 30 St <br />! / // <br />a. <br />2,347 <br />TOTAL EXPENSES <br />0 <br />0 <br />0 <br />367 <br />2,614 <br />0 <br />0 <br />0 <br />0 <br />2,981 <br />FUND SOURCES <br />Awarded Grant <br />367 <br />2,614 <br />2,981 <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />City Oper. Revenue <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />TOTAL SOURCES <br />0 <br />0 <br />0 <br />367 <br />2,614 <br />0 <br />0 <br />0 <br />0 <br />2,981 <br />3 <br />2019 - 2024 Capital Improvement Program <br />Project Location <br />: 5i <br />0e � 1ati a5m�.o.,.e.wmo <br />yC. <br />y �mb� <br />i B��cces J'.., <br />s— <br />5 <br />I> <br />M ti <br />n <br />j <br />a FF S112 St <br />o <br />D <br />y m <br />i <br />✓': <br />e sys <br />a <br />1,• <br />' <br />Pom <br />DD <br />N as <br />� s <br />a <br />v <br />122 Str ny <br />4 <br />o <br />� <br />b <br />S128 $ <br />I H <br />GIS <br />k\ b 30 St <br />! / // <br />a. <br />3 <br />2019 - 2024 Capital Improvement Program <br />