Laserfiche WebLink
hin t i State <br />a tme t of Trrarrasportatk,r <br />December 6, 2017 <br />Mr. Robin Tischmak <br />Interim Public Works Director <br />City of Tukwila <br />6300 Southcenter Blvd., Suite 100 <br />Tukwila, Washington 98188-2545 <br />S Bar/Airport Way <br />2017 Local Bridge Program <br />Federal Funding <br />Dear Mr. Tischmak: <br />Transporcauor, uuiir.+ing <br />310 Maple Park Avenue S.C. <br />P.O. Box 47300 <br />Olympia, WA 98504-7300 <br />360-705-7000 <br />TTY: 1-800-833-6388 <br />wwwwsdot.wa.yov <br />DECC 21117 <br />T LUIcANIL.O, <br />PUBLIC WORKS <br />WSDOT is pleased to advise you that the above mentioned bridge project was recently selected. The <br />federal funding is limited to the amount shown below: <br />S Bar/Airport Way $2,981,055 <br />Scope: Seismic <br />NOTE: This project requires 13.5 percent local match. If construction is authorized by December <br />2020, the project is eligible for 100 percent federal funding for eligible costs. Preventative maintenance <br />projects are limited to a maximum $3 million. <br />In order to meet state and federal requirements, the following are required: <br />■ Project expenditures incurred before receiving notice from Local Programs of federal fund <br />authorization are not eligible for reimbursement. <br />■ Please refer to the Local Programs webpage for detailed information, including: <br />(htto://www.wsdot.wa.aovilocaluroglams/) <br />✓ Local Agency Guidelines (LAG) manual for the requirements regarding programming, <br />authorization, reimbursement, etc.; <br />✓ Projects utilizing federal funds must be included in your current Transportation <br />Improvement Program (TIP) as a complete programmed project. Once your TIP <br />amendment is approved, WSDOT will amend the Statewide Transportation <br />Improvement Program (STIP); <br />✓ Funding and billing forms; <br />✓ Quarterly Project Reporting is required to be completed by the end of March, June, <br />September, and December each year. To access the database you will need an account <br />name and password. Your account name is Tukwila and your password is Tukwi785. <br />The password is case sensitive. <br />As a reminder, Local Programs requires all agencies to submit monthly progress billings to ensure <br />timely reimbursement of eligible federal expenditures. <br />For assistance please contact Mehrdad Moini, your Region Local Programs Engineer, at 206.440.4734. <br />Sincerely, <br />Kathleen B. Davis <br />Director <br />Local Programs <br />KBD:st:sas <br />cc: Kelly McGourty, Transportation Director, PSRC <br />Mehrdad Moini, Northwest Region Local Programs Engineer, MS NB82-121 <br />2 <br />