City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-02-26 Transportation and Infrastructure
>
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
2/22/2018 12:51:50 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-4 <br />6.1 Survey Support: Consultant will provide on call survey spot checks as requested by City or CM team. <br />Construction surveying is the Contractors responsibility. <br />6.2 Material Testing: Coordinate the work of the materials testing technicians and testing laboratories <br />in the observation and testing of materials used in the construction; document and evaluate results <br />of testing; and address deficiencies. Frequency of testing shall be as prescribed in the WSDOT <br />Construction Manual and LAG manual. <br />Materials testing will be performed by a Sub -consultant. The Sub -consultant will meet qualified tester <br />requirements as identified in WSDOT LAG 52.3.32 for projects on NHS highway systems. A budget <br />allowance of $50,000 is included in the budget. <br />Assumptions <br />• Contractor shall be responsible for utilizing their own PLS additional survey necessary to construct <br />the Work. <br />TASK 7 - ADDITIONAL SERVICES <br />Additional services requested by the client, will be performed only when authorized by the client. <br />Authorization to perform additional services will be in writing, specifying the work to be performed, and <br />basis of payment. Items such as Community Outreach (except as completed on a day to day basis by the <br />inspector and resident engineer as described herein), Public Meetings, Ribbon Cutting Ceremony, claims <br />analysis, additional surveying, services during shutdown periods of non -working days, and services for <br />extended working days are examples of possible additional services. This fee is based on 235 working days <br />(two weeks prior to construction, 215 working day contract and two weeks for closeout, 8 hour days), <br />additional extension of days will be approximately $3,000 per day. <br />City of Tukwila 53rd Ave S <br />Construction Management Services <br />Scope of Work <br />Page 9 of 9 <br />KPG <br />Project #15085 <br />February 2018 <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.