Laserfiche WebLink
EXHIBIT A-4 <br />6.1 Survey Support: Consultant will provide on call survey spot checks as requested by City or CM team. <br />Construction surveying is the Contractors responsibility. <br />6.2 Material Testing: Coordinate the work of the materials testing technicians and testing laboratories <br />in the observation and testing of materials used in the construction; document and evaluate results <br />of testing; and address deficiencies. Frequency of testing shall be as prescribed in the WSDOT <br />Construction Manual and LAG manual. <br />Materials testing will be performed by a Sub -consultant. The Sub -consultant will meet qualified tester <br />requirements as identified in WSDOT LAG 52.3.32 for projects on NHS highway systems. A budget <br />allowance of $50,000 is included in the budget. <br />Assumptions <br />• Contractor shall be responsible for utilizing their own PLS additional survey necessary to construct <br />the Work. <br />TASK 7 - ADDITIONAL SERVICES <br />Additional services requested by the client, will be performed only when authorized by the client. <br />Authorization to perform additional services will be in writing, specifying the work to be performed, and <br />basis of payment. Items such as Community Outreach (except as completed on a day to day basis by the <br />inspector and resident engineer as described herein), Public Meetings, Ribbon Cutting Ceremony, claims <br />analysis, additional surveying, services during shutdown periods of non -working days, and services for <br />extended working days are examples of possible additional services. This fee is based on 235 working days <br />(two weeks prior to construction, 215 working day contract and two weeks for closeout, 8 hour days), <br />additional extension of days will be approximately $3,000 per day. <br />City of Tukwila 53rd Ave S <br />Construction Management Services <br />Scope of Work <br />Page 9 of 9 <br />KPG <br />Project #15085 <br />February 2018 <br />48 <br />