City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-02-26 Transportation and Infrastructure
>
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
2/22/2018 12:51:50 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />STATUS: <br />MAINT. IMPACT <br />COMMENT: <br />CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />53rd Ave S (S 137th St - S 144th St) Project No. 89110301 <br />Design and construct urban residential street improvements that include curb, gutter, sidewaik, undergrounding, <br />and illumination. Street will coordinate with Water $1.1m, Sewer $185k, and Surface Water $920k CIP projects. <br />Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization. <br />Undergrounding is inctuded at this time. <br />Reduce pavement, shoulder, and drainage work. <br />State TIB grant for $2.14M for roadway and drainage. See additional pages in Enterprise funds under <br />53rd Ave S Projects. Seattle City Light is now negotiating a 60/40 underground split and undergrounding <br />costs have been added to project, Bond for $2 million, <br />FINANCIAL <br />in $000's <br />Through Estimated <br />2015 2016 2017 <br />2018 2019 2020 2021 2022 BEYOND TOTAL <br />EXPENSES <br />Design <br />83 <br />107 <br />3 <br />193 <br />Land(RNV) <br />2 <br />98 <br />100 <br />Const. MgmL <br />435 <br />435 <br />870 <br />Construction <br />1.050 <br />1.050 <br />2.100 <br />Unda/gmunding <br />1,125 <br />1,125 <br />2,250 <br />TOTAL EXPENSES <br />85 <br />205 <br />2,613 <br />2.610 <br />0 <br />0 <br />0 <br />0 <br />0 <br />5,513 <br />FUND SOURCES <br />UhU8esYmS/SVYM <br />25 <br />25 <br />Awarded TIB Grant <br />800 <br />800 <br />Remainder of grant in SWM <br />1.800 <br />Seattle City Light <br />675 <br />675 <br />1.350 <br />Bond <br />1.000 <br />1,000 <br />2.000 <br />City Oper. Revenue <br />60 <br />205 <br />38 <br />35 <br />0 <br />338 <br />TOTAL SOURCES <br />85 <br />205 <br />2.613 <br />2'610 <br />U <br />o <br />V <br />U <br />0 <br />5,513 <br />umr'uuexCapital Improvement Program <br />3 <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.