City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-02-26 Transportation and Infrastructure
>
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
2/22/2018 12:51:50 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-4 <br />Observe material, workmanship, and construction areas for compliance with the Contract <br />Documents and applicable codes, and notify construction contractor of noncompliance. <br />Advise the Client of any non -conforming work observed during site visits. <br />iii. Document all material delivered to the job site in accordance with the LAG Manual. <br />iv. Prepare daily inspection reports, recording the construction contractor's operations as <br />actually observed by the Consultant; includes quantities of work placed that day, <br />contractor's equipment and crews, and other pertinent information. All daily inspection <br />reports will adhere to WSDOT Local Agency Guidelines. <br />v. Interpret Contract Documents in coordination with Client and the Client's Contractor. <br />vi. Resolve questions which may arise as to the quality and acceptability of material <br />furnished, work performed, and rate of progress of work performed by the construction <br />contractor. <br />vii. Establish communications with adjacent property owners. Respond to questions from <br />property owners and the general public. <br />viii. Coordinate with permit holders on the Project to monitor compliance with approved <br />permits, if applicable. <br />ix. Prepare field records and documents to help assure the Project is administered in <br />accordance with funding agency requirements. <br />x. Collect and calculate delivery tickets and scaleman's daily reports of aggregate. All tickets <br />will be initialed with correct bid item and stationing identified (Construction Manual 10- <br />2). <br />xi. Attend and actively participate in regular on-site weekly construction meetings. <br />xii. Take periodic digital photographs during the course of construction, and record locations. <br />xiii. Coordinate with the Client's traffic operations and maintenance personnel. <br />xiv. Punch list. Upon substantial completion of work, coordinate with the Client and affected <br />agencies to prepare a `punch list' of items to be completed or corrected. Coordinate final <br />inspection with the Client and those agencies. <br />4.2 Material Testing: Coordinate with the Contractor and the Material testing firm to schedule testing of <br />materials in the field meet specifications. <br />4.3 Utility Coordination: Coordinate with the various utility companies and contractor regarding utility <br />work. Consultant shall provide opportunities for each entity to coordinate and shall make every effort <br />possible to ensure coordination efforts are timely, effective, and executed to the benefit of the <br />project. Consultant cannot guarantee client's Contractor or Franchise Utilities performance of work. <br />4.4 Close Out: Upon substantial completion of work, coordinate with the client and other affected <br />agencies, to perform a project inspection and develop a comprehensive list of deficiencies or <br />`punchlist' of items to be completed. A punchlist and Certificate of Substantial Completion will be <br />prepared by the Consultant and issued by the client. <br />Assumptions: <br />City of Tukwila 53rd Ave S Page 4 of 9 KPG <br />Construction Management Services Project#15085 <br />Scope of Work February 2018 <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.