City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-02-26 Transportation and Infrastructure
>
TIC 2018-02-26 Item 2G - Contract Supplement #4 - 53rd Avenue South (South 137th Street - South 144th Street) Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
2/22/2018 12:51:50 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-4 <br />• Consultant will provide observation services for the days/hours that the Contractor's <br />personnel are on-site. <br />o Assumption is client's Contractor shall work normal 40 hour work weeks. <br />• The Consultant's monitoring of the construction contractor's activities is to ascertain whether <br />or not they are performing the work in accordance with the Contract Documents; in case of <br />noncompliance, Consultant will reject non -conforming work, and pursue the other remedies <br />in the interests of the client, as detailed in the Contract Documents. The Consultant cannot <br />guarantee the construction contractor's performance, and it is understood that Consultant <br />shall assume no responsibility for: proper construction means, methods, techniques; project <br />site safety, safety precautions or programs; or for the failure of any other entity to perform <br />its work in accordance with laws, contracts, regulations, or client's expectations. <br />Deliverables <br />• Daily Construction Reports with project photos — submitted on a weekly basis <br />• Punch List, Certificate of Substantial Completion <br />• Review test reports for compliance <br />TASK 5 — CONSTRUCTION SERVICES — OFFICE <br />5.1 Document Control. The Consultant shall provide the services of a full-time document control <br />specialist. Original documentation will be housed at KPG's Tacoma office, and filed in accordance <br />City of Tukwila 53rd Ave S <br />Construction Management Services <br />Scope of Work <br />Page 5 of 9 <br />KPG <br />Project #15085 <br />February 2018 <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.