Laserfiche WebLink
EXHIBIT A-4 <br />with standard filing protocol to meet WSDOT Highways & Local Program Requirements & City of <br />Tukwila requirements. <br />Document Control also consists of preparing Final Project Reports for the Client and includes: <br />• Final Estimate (Approving Authority File) <br />• Comparison of Preliminary and Final Quantities (Approving Authority File) <br />• Final Records as identified in WSDOT LAG (Approving Authority File) <br />• Record of Material Samples and Tests <br />• Affidavit of Wages Paid <br />• Release for the Protection of Property Owners and General Contractor <br />• Property owner and environmental commitment file <br />5.2 Project Coordination: Liaison with Client, construction contractor, engineer and utilities on a regular <br />basis to discuss project issues and status. <br />5.3 Utility Coordination: Liaison with franchise utilities on a regular basis to assess status of relocation <br />activities, coordinate with both Contractor and utilities in the event of unforeseen utility conflicts, <br />and coordinate with both Contractor and utilities to protect existing utilities during construction. <br />5.4 Material Testing - Documentation: Compiling, recording, and distribution of any testing reports. <br />5.5 Weekly Meetings: Lead weekly meetings, including preparation of agenda, meeting minutes, and <br />distribution of minutes to attendees. Outstanding issues to be tracked on a weekly basis. <br />5.6 Initial Schedule Review: Perform detailed schedule review of contractor provided CPM for <br />conformance with the contract documents. <br />5.7 Lump Sum Breakdown: Evaluate construction contractor's Schedule of Values for lump sum items. <br />Review the Contract Price allocations and verify that such allocations are made in accordance with <br />the requirements of the Contract Documents. Lump Sum Breakdowns for payment each month will <br />be calculated with detailed data per WSDOT LAG Requirements. <br />5.8 Monthly Pay Requests: Prepare monthly requests for payment, review with the client, contractor, <br />and approve as permitted. Utilize client provided format for pay estimates, or Consultant format. <br />5.9 Monthly Schedule Review: At the monthly cutoff, review contractor's updated schedule and <br />compare with field -observed progress. In addition, perform schedule analysis on contractor <br />provided CPM updates and review schedule for delays and impacts. Coordinate with Contractor in <br />the development of recovery schedules, as needed, to address delays caused by either events or <br />issues within the Contractor's control or other events or issues beyond the Contractor's control. <br />5.10 Certified Payroll: Process and track all certified payroll per WSDOT Highways & Local Program <br />Requirements. This includes verifying the initial payroll for compliance and 10% of all payrolls <br />City of Tukwila 53rd Ave S <br />Construction Management Services <br />Scope of Work <br />Page 6 of 9 <br />KPG <br />Project #15085 <br />February 2018 <br />45 <br />