City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-02-26 Item 2I - Contract Supplement #4 - Tukwila Urban Center Pedestrian-Bicycle Bridge with AKANA
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-02-26 Transportation and Infrastructure
>
TIC 2018-02-26 Item 2I - Contract Supplement #4 - Tukwila Urban Center Pedestrian-Bicycle Bridge with AKANA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
2/22/2018 12:53:56 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
in <br />City of Tukwila <br />Allan Ekberg, Mayor <br />Public Works Department - Henry Hash, Director <br />INFORMATIONAL MEMORANDUM <br />TO: Transportation and Infrastructure Committee <br />FROM: Henry Hash, Public Works Director °,!, <br />BY: Peter Lau, Senior Program Manager <br />CC: Mayor Allan Ekberg <br />DATE: February 23, 2018 <br />SUBJECT: Tukwila Urban Center Pedestrian/Bicycle Bridge Project <br />Project No. 90510403, Contract No. 16-092 <br />Supplemental Agreement No. 4 with AKANA <br />ISSUE <br />Authorize the Mayor to execute Supplemental Agreement No. 4 to Consultant Contract No. 16-092 with <br />AKANA in the amount of $180,448.00. <br />BACKGROUND <br />AKANA's Contract No. 16-092, with Supplemental Agreements 1 to 3, have been providing construction <br />management (CM) services for the Tukwila Urban Center (TUC) Pedestrian/Bicycle Bridge Project. <br />DISCUSSION <br />The TUC Pedestrian/Bicycle Bridge Project has been delayed from physical completion due to delays <br />from steel bridge and handrail fabrications, and some design inadequacies. Based on the construction <br />contractor's latest projection, the construction work will likely be completed in April 2018. The <br />consultant contract fund with AKANA was already used up in December 2017, because Supplemental <br />Agreement No. 3 only allowed AKANA to provide CM services up to November 2017. In order to have <br />continuous CM support from AKANA through the end of the construction project, Supplemental <br />Agreement No. 4 is needed for their continuous services including closing out the project. <br />FISCAL IMPACT <br />The 15% construction contingency was $942,835.59 and will cover AKANA's Supplemental Agreement <br />No. 4. There have been $57,946.50 in construction change orders to date, and AKANA's Supplement <br />Nos. 2 and 3 for $251,169.00 were also drawn from this contingency. Supplemental Agreement No. 4 <br />for $180,448.00 was carefully reviewed and is reasonable to close out this construction project. <br />CM & CO Expenses 15% Contingency <br />AKANA Supplement No. 3 $ 180,448.00 $942,835.59 <br />AKANA Supplement Nos. 2 & 3 251,169.00 <br />Change Orders No.1 to No. 6 57,946.50 <br />Total: $489,563.50 $942,835.59 <br />RECOMMENDATION <br />Council is being asked to approve Supplemental Agreement No. 4 with AKANA in the amount of <br />$180,448.00 for the TUC Pedestrian/Bicycle Bridge Project and consider this item on the Consent <br />Agenda at the March 5, 2018 Regular Meeting. <br />Attachments: AKANA's Supplemental Agreement No. 4 <br />W:IPW EngIPROJECTSIA- RW 8, RS Projects\TUC Ped Bicycle Bridge (90510403)IConstructionW.100 - Contract Documents\CM Consultant\AKANAISup #41Info Memo for AKANA Sup #4, 2-12-18.docx <br />63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.