City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-02-26 Item 2I - Contract Supplement #4 - Tukwila Urban Center Pedestrian-Bicycle Bridge with AKANA
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-02-26 Transportation and Infrastructure
>
TIC 2018-02-26 Item 2I - Contract Supplement #4 - Tukwila Urban Center Pedestrian-Bicycle Bridge with AKANA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
2/22/2018 12:53:56 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
02/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Alak <br />WIWashington State <br />Department of Transportation <br />Supplemental Agreement <br />Number 4 <br />Organization and Address <br />Cooper Zietz Engineers, Inc. <br />3380 146 Place SE, Suite 105 <br />Bellevue, Washington 98007 <br />Phone: <br />Original Agreement Number <br />16-092 <br />Project Number <br />90510403 <br />Execution Date <br />July 25, 2016 <br />Completion Date <br />September 30, 2018 <br />Project Title <br />Tukwila Urban Center Pedestrian/Bicycle Bridge <br />New Maximum Amount Payable <br />$1,168,998.00 <br />Description of Work <br />See Summary of Payments "Exhibit A" attached. <br />See Scope of Work "Exhibit B" attached. <br />See Prime Consultant Cost Computation "Exhibit D" attached. <br />See Sub -Consultant Cost Computation "AECOM Exhibit E" attached. <br />The Local Agency of City of Tukwila <br />desires to supplement the agreement entered in to with Cooper Zietz Engineers, Inc <br />and executed on February, 2018 and identified as Agreement No 4 <br />All provisions in the basic agreement remain in effect except as expressly modified by this supplement. <br />The changes to the agreement are described as follows: <br />Section 1, SCOPE OF WORK, is hereby changed to read: <br />Scope of Services. See Exhibit B attached <br />11 <br />Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days <br />for completion of the work to read: September 30, 2018 <br />111 <br />Section V, PAYMENT, shall be amended as follows: <br />The Consultant shall be paid by the City for completed work and for services rendered under this Agreement as follows: Payment <br />for the work provided by the Consultant shall be supplemented with $180,448.00 as provided on Exhibits "A", "D" and "E" attached <br />hereto. <br />as set forth in the attached Exhibit A, and by this reference made a part of this supplement. <br />If you concur with this supplement and agree to the changes as stated above, please sign in the Appropriate <br />spaces below and return to this office for final action. <br />By: J e.C.c f '' A'- din,, 1.41/0„.• <br />- 1/ By. <br />R7 <br />DOT Form 140-063 <br />Revised 09/2005 <br />Consul nt Signature Approving Authority Signature <br />Date <br />64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.