Laserfiche WebLink
2.5 Change Management <br />Project Managers from CLIENT and CONSULTANT are responsible for managing changes to the scope and <br />schedule. CLIENT is responsible for the authorization of any changes to the scope, budget, and/or <br />schedule. Team members must ensure that work within their areas remains within the defined project <br />scope, schedule, and budget. When issues, actions, or circumstances occur that could cause a change in <br />scope, personnel, cost, or schedule, team members must communicate potential changes to the Project <br />Manager as early as possible. Project Managers will determine whether the potential change issue will <br />lead to a change in scope, cost, or schedule. <br />CONSULTANT shall obtain written authorization from CLIENT before implementing any change to this <br />Scope of Services, schedule, or budget. All changes will be documented using the Project Change Form. <br />TASK 300 SANITAI"Y SE\'m El!' GIS INVENT° <br />pr <br />Y <br />3.1 Field Review <br />CONSULTANT will conduct an existing as-built/GIS review at the outset of the project to identify key field <br />conditions that may impact the field mapping including safety, traffic and access issues. The procedures <br />required to complete the field survey will be determined and safety risks will be analyzed. Structures <br />requiring subconsultant assistance for traffic control to survey will be identified and will be scheduled to <br />be completed with other structures requiring traffic control. <br />Coordinate with traffic control subconsultant. <br />Prepare traffic control plans when needed. <br />3.2 Data Collection <br />CONSULTANT will field survey the location and collect attributes for up to 50 Sanitary Sewer Manholes <br />and there accompanying pipes. Photographs and supplemental measurement data sheets will be <br />collected to support project deliverables. Structure sizes and depths, pipe sizes and invert elevations, etc. <br />will be measured in the field so that necessary database attribute information can be completed. <br />Field measurement data will be collected electronically in the field, which will update the GIS database <br />electronically from the field. Additionally, hard copy structure cards will be completed in the field with <br />the same measurements so that a quality control check of the information collected electronically in the <br />field can be performed. <br />CONSULTANT will use CLIENT provided GIS database structure. <br />3.3 Sanitary Sewer As -Built Research <br />CONSULTANT will review research on existing utility information, provided by CLIENT, for inclusion in the <br />mapping. Where possible CONSULTANT will use provided as -built records to prepare and pre -enter <br />attribute information to be field verified. This will make the field effort more efficient. <br />3.4 Geodatabase Update <br />CONSULTANT will utilize its field surveyed information, and the as -built research to update the CLIENT's <br />existing Geodatabase GIS files. <br />CONSULTANT will include metadata for the Geodatabase updates. <br />Deliverables: Electronic copy of the updated Geodatabase <br />City of Tukwila <br />Sanitary Sewer and Surface Water GIS Inventory and Update <br />Scope of Services <br />March 12, 2018 <br />48 <br />