City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-03-26 Item 2B - Contract Amendment #2 - GIS Services for Water, Sanitary Sewer and Surface Water
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-03-26 Transportation and Infrastructure
>
TIC 2018-03-26 Item 2B - Contract Amendment #2 - GIS Services for Water, Sanitary Sewer and Surface Water
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
3/23/2018 10:15:41 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK 4.0 STa! i' Ail WATER GLS INVENT°?' Y <br />4.1 Field Review <br />CONSULTANT will conduct an existing as-built/GIS review at the outset of the project to identify key field <br />conditions that may impact the field mapping including safety, traffic and access issues. The procedures <br />required to complete the field survey will be determined and safety risks will be analyzed. Structures <br />requiring subconsultant assistance for traffic control to survey will be identified and will be scheduled to <br />be completed with other structures requiring traffic control. <br />Coordinate with traffic control subconsultant. <br />Prepare traffic control plans when needed. <br />42 Data Collection <br />CONSULTANT will field survey the location and collect attributes for up to 350 Storm Drain Features and <br />their accompanying pipes. Structure sizes and depths, pipe sizes and invert elevations, etc. will be <br />measured in the field so that necessary database attribute information can be completed. <br />Field measurement data will be collected electronically in the field, which will update the GIS database <br />electronically from the field. Additionally, hard copy structure cards will be completed in the field with <br />the same measurements so that a quality control check of the information collected electronically in the <br />field can be performed. <br />CONSULTANT estimates that the miscellaneous GIS updates that thus far have been requested by CLIENT <br />can be completed within the allocated budget. In addition, as budget allows CLIENT will provide <br />CONSULTANT additional CIP project plan sets to be need to be incorporated in to the GIS database. <br />The CONSULTANT will use CLIENT provided GIS database structure. <br />4.3 Storm Water As -Built Research <br />CONSULTANT will review research on existing utility information, provided by CLIENT, for inclusion in the <br />mapping. Where possible CONSULTANT will use provided as -built records to prepare and pre -enter <br />attribute information to be field verified. This will make the field effort more efficient. <br />4.4 Geodatabase Preparation <br />CONSULTANT will utilize its field surveyed information, and the as -built research to update the CLIENT's <br />existing Geodatabase GIS files. <br />The CONSULTANT will include metadata for the Geodatabase updates. <br />Deliverables: Electronic copy of the updated Geodatabase <br />City of Tukwila <br />Sanitary Sewer and Surface Water GIS Inventory and Update <br />Scope of Services <br />March 12, 2018 <br />49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.