Laserfiche WebLink
Andover Park East <br />City of Tukwila <br />2.4 Review and archive Certificates of Materials Origin tracking and reconcile against the Projects <br />Record of Materials prepared by others. <br />2.5 Attend and provide minutes for up to 26 weekly contractor construction progress meetings. <br />2.6 Maintain a material testing log that tracks the test date, type of material test, test result, <br />specification requirement and action taken if a failed result is received from the material testing <br />consultant. <br />2.7 Maintain a list of approved change orders and potential change orders. Potential change orders <br />will have a force account estimate of the extra work related to that item(s), until an approved <br />change order is executed. <br />Subtask 3 — Field Inspection <br />The Consultant shall provide construction inspection services consistent with the hours shown in <br />EXHIBIT B - Rev 1. This effort will include the following elements: <br />3.1 Prepare daily construction reports recording the contractor's operations performed for each day <br />the Consultant is on site; measure the quantities of materials installed, log equipment and staff <br />present, weather conditions, and any observed problems or construction issues. <br />3.2 Prepare Daily Payment Notes, Statements of Working Days, and Force Account Records (if <br />necessary). <br />3.3 Respond to contractor questions which may arise as to the quality and acceptability of <br />furnished materials or work performed per the requirements of the construction contract <br />documents. <br />3.4 Respond to general questions raised by adjacent property owners, businesses, or general <br />public. Complaints or detailed questions shall be referred to the Client. <br />3.5 Prepare field records and documents in accordance with Projects Record of Materials. <br />3.6 Coordinate with Resident Engineer and Client for changes and updates to the ROM. <br />3.7 For each day the Consultant is on site, provide photographs of traffic control set-up and work <br />activities during the course of construction. Photographs will be in digital format and cataloged <br />by date. <br />3.8 Facilitate the Contractor's coordination with existing utilities within the project boundaries. <br />3.9 Review the Record of Materials (ROM) against the material testing results provided by the <br />Project's material testing consultant, and advise the Contractor accordingly. <br />3.10 Monitor the Contractor's compliance with water quality permits and the requirements of the <br />TESC and SPCC Plans. <br />3.11 Attend added weekly construction meetings due to extended contract time. (WORK <br />COMPLETE BUT UNPAID ADDED COSTS ARE INCLUDED) <br />3.12 The Construction Inspector shall review monthly pay estimates with the Contractor and provide <br />recommendations to the Resident Engineer and Client. (WORK COMPLETE BUT UNPAID <br />ADDITIONAL COSTS EXPENDED FOR THIS DUE TO ADDITIONAL PAY ESTIMATES ON <br />THE PROJECT IS INCLUDED) <br />3.13 Verify Contractor provided markups accuracy and forward to the Client. The Consultant <br />Inspector will track and record field changes on drawings and use this information to verify the <br />Contractor's construction record drawings. <br />3.14 Participate in the Project's final inspection and assist in developing a list of any remaining <br />deficiencies. (WORK COMPLETE BUT UNPAID COSTS ARE INCLUDED) <br />3.15 For the days present on site, the construction inspector shall observe day-to-day construction <br />activities. By providing inspection oversight, the Consultant shall assume no responsibility for <br />proper construction techniques or job site safety but will report to the Contractor and Client any <br />known public safety concerns immediately. The presence of the Consultant's personnel at the <br />Page 2 of 5 <br />Updated: 3/5/2018 <br />60 <br />