City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-03-26 Item 2C - Agreement - Andover Park East Water and Sewer Replacement Construction Management with AECOM
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-03-26 Transportation and Infrastructure
>
TIC 2018-03-26 Item 2C - Agreement - Andover Park East Water and Sewer Replacement Construction Management with AECOM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
3/23/2018 10:15:58 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Andover Park East <br />City of Tukwila <br />construction site is for the purpose of providing to the Client a greater degree of confidence that <br />the completed work will generally conform to the Contract Documents and that the integrity of <br />the design concept as reflected in the Contract Documents has been implemented and <br />preserved by the Construction Contractor. <br />3.16 The Consultant will endeavor to protect all parties against defects and deficiencies in the work <br />of the Contractor, but cannot guarantee the Contractor's performance and shall not be <br />responsible for construction means, methods, measurements, techniques, sequences of <br />procedures, or for safety precautions and programs in connection with the work performed by <br />the Construction Contractor and any subcontractors. <br />Subtask 4 — Construction Management <br />Provide construction management services, consistent with the hours shown in EXHIBIT B — Rev 1. This <br />effort will include the following elements: <br />4.2 Supervise the Consultant's field personnel assigned to the project. <br />4.3 Liaison between the Contractor's management and the Client's management personnel, acting <br />as the direct point of contract for both parties. <br />4.4 Review and approve daily construction reports prepared by the construction inspector. <br />4.5 Respond to contractor questions which may arise as to the quality and acceptability of <br />furnished materials, work performed, and to general questions raised by adjacent property <br />owners or general public. <br />4.6 Facilitate coordination between the Contractor, Client and project stakeholders regarding status <br />and issues of construction activities. <br />4.7 Chair additional weekly construction meetings. (WORK COMPLETE BUT UNPAID ADDED <br />COSTS ARE INCLUDED) <br />4.8 Prepare official correspondence to the Contractor and issue upon the Client's approval. <br />4.9 Review monthly pay estimates with the Contractor and provide recommendation to the Client <br />for release of payment. <br />4.10 Supervise contract close-out activities including as -built drawings, final payment, and <br />completion notices. Consultant shall provide the Client, at contract close-out, construction <br />records to the all applicable funding agencies. <br />4.11 The Consultant shall assume no responsibility for proper construction techniques or job site <br />safety but will report to the Contractor and Client any observed public safety concerns <br />immediately. The presence of the Consultant's personnel at the construction site is for the <br />purpose of providing to the Client a greater degree of confidence that the completed work will <br />generally conform to the Contract Documents and that the integrity of the design concept as <br />reflected in the Contract Documents has been implemented and preserved by the construction <br />Contractor. <br />4.12 The Consultant will endeavor to protect all parties against defects and deficiencies in the work <br />of the Contractor, but cannot guarantee the Contractors' performance and shall not be <br />responsible for construction means, methods, measurements, techniques, sequences of <br />procedures, or for safety precautions and programs in connection with the work performed by <br />the construction contractor and any subcontractors. <br />Subtask 6 — Materials Testing <br />The Consultant will retain a materials testing subconsultant to perform soil and concrete testing which <br />includes: gradations, in-place density, Proctor compaction tests, concrete air entrainment, concrete test <br />cylinders, and asphalt composition. These services are budgeted as an allowance and the actual costs of <br />Page 3 of 5 <br />Updated: 3/5/2018 <br />61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.