Andover Park East <br />City of Tukwila <br />the testing effort may vary. The Consultant shall advise the Client regarding the status of the materials <br />testing budget to allow funds to be added or removed as necessary. <br />In addition to traditional materials testing, Contaminated Materials from the project site were discovered. <br />The Consultant retained a firm to perform testing on potentially contaminated materials. The Consultant <br />performed additional services for sampling, analysis, and disposal permitting. <br />THIS TASK'S WORK IS COMPLETE BUT UNPAID COSTS ARE INCLUDED. <br />Subtask 7 — Archaeological Monitoring and Inadvertent Discovery Plan and Field <br />Monitoring. <br />The Consultant shall prepare Archaeological Monitoring and Inadvertent Discovery Plan to the <br />Washington State Historic Preservation Officer (SHPO), Department of Archaeology and Historic <br />Preservation (DAHP) and the Tribes. The Plan shall address the required response by the contractor and <br />project team for a potential intersection of the construction work with pre -contact archaeology or human <br />remains. The plan shall be based upon previous archeological surveys by others. The draft plan shall be <br />submitted to DAHP and the Tribes for comment and subsequently finalized. At the conclusion of open cut <br />excavation activities, the Consultant shall prepare a final report summarizing the findings of the <br />monitoring effort. The Consultant shall provide a qualified archaeological monitor during open cut <br />excavation activities by the Contractor. This person shall be responsible for monitoring the Contractor's <br />compliance with the Archaeological Monitoring and Inadvertent Discovery Plan, and to be available to <br />respond to related Contractor questions. The monitor shall not enter the excavation without the specific <br />direction by the Consultant's Resident Engineer. <br />THIS TASK'S WORK IS COMPLETE BUT UNPAID COSTS ARE INCLUDED. <br />Subtask 8 — Change Order Resolution <br />The Consultant shall provide services for preparing change order packages consistent with the hours <br />shown in Exhibit B — Rev 1, this includes independent cost estimates (ICE), change order forms; and, <br />force account records. <br />Subtask 9 — Claims/Disputes Support <br />Consultant will use existing records from construction to summarize remaining dispute items for <br />reconciliation between Contractor and the City of Tukwila and coordinate/attend one meeting to try to <br />resolve these issues equitably. <br />Ill. Consultant Deliverables; including but not limited to: <br />Inspector Daily Reports <br />ii. Construction Photographs <br />iii. Weekly Meeting Minutes and Agendas <br />iv. Submittal, RFI, and Material Testing Logs <br />v. Change Order Log <br />vi. Monthly Contractor Pay Requests with field note record and quantity documentation <br />vii. Punch -lists and tracking documentation <br />viii. All Project Records received from the Contractor described under Subtask 2 <br />ix. Other records generated as a result of this Contract, when requested by the Client, or as <br />deemed necessary by a public record request. <br />Page 4 of 5 <br />Updated: 3/5/2018 <br />62 <br />