City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-03-26 Item 2C - Agreement - Andover Park East Water and Sewer Replacement Construction Management with AECOM
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-03-26 Transportation and Infrastructure
>
TIC 2018-03-26 Item 2C - Agreement - Andover Park East Water and Sewer Replacement Construction Management with AECOM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
3/23/2018 10:15:58 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: Andover Park E Water Main Replacement Project No. 99940103 <br />DESCRIPTION: Design and construct 2,700 LF of new 8" & 16" ductile iron pipe along Andover Park East from Tukwila Pkwy <br />to Strander Blvd. <br />JUSTIFICATION: Support future growth within this area of the CBD as aging cast iron system has suffered frequent failures. <br />STATUS: Survey and design is complete. Construction is scheduled for 2016 from Strander Blvd to Tukwila Pkwy <br />with final paving in 2017. <br />MAINT. IMPACT: A new pipe will significantly reduce impact on crews from the risk of cataclysmic events. <br />COMMENT: PV TF loans were rescinded in 2014 & 2015 by the State Legislature. <br />FINANCIAL Through Estimated <br />(in $000's <br />2015 2016 <br />2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />BEYOND TOTAL <br />EXPENSES <br />t) Project Location <br />- <br />e 5,5001Act. ., v <br />51 r11` <br />a:-% <br />/Y <br />1615E <br />'YV`�1/� <br />5 0041 <br />Design <br />140 <br />59 <br />�.1 <br />��i <br />X11 <br />�a . I� <br />J ,7 <br />1 I <br />1 ': <br />199 <br />Land (RAN) <br />-- <br />1 <br />, - f <br />U m <br />0 <br />Const. Mgmt. <br />N " <br />1 <br />p 7 IE <br />4I as <br />284 <br />100 <br />S,EO I <br />384 <br />Construction <br />2,100 <br />685 <br />2,785 <br />TOTAL EXPENSES <br />140 <br />2,443 <br />785 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />3,368 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed Bond <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />Utility Revenue <br />140 <br />2,443 <br />785 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />3,368 <br />TOTAL SOURCES <br />140 <br />2,443 <br />785 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />3,368 <br />2017 - 2022 Capital Improvement Program <br />60 <br />52 <br />t) Project Location <br />- <br />e 5,5001Act. ., v <br />51 r11` <br />a:-% <br />/Y <br />1615E <br />'YV`�1/� <br />5 0041 <br />�.1 <br />��i <br />X11 <br />�a . I� <br />J ,7 <br />1 I <br />1 ': <br />-- <br />1 <br />, - f <br />U m <br />N " <br />1 <br />p 7 IE <br />4I as <br />IJ a vow <br />FWwlq[b <br />se2�. <br />Ey .b <br />S,EO I <br />GIS <br />2017 - 2022 Capital Improvement Program <br />60 <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.