City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-03-26 Item 2C - Agreement - Andover Park East Water and Sewer Replacement Construction Management with AECOM
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-03-26 Transportation and Infrastructure
>
TIC 2018-03-26 Item 2C - Agreement - Andover Park East Water and Sewer Replacement Construction Management with AECOM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:57 PM
Creation date
3/23/2018 10:15:58 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
03/26/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: Andover Park East Sewer Replacement Project No. 91440204 <br />DESCRIPTION: Design and construct 1,600 LF of 15" and 12" sanitary sewer from Strander Blvd. to 1-405 in Andover Park E. <br />JUSTIFICATION: Sewer improvement will provide additional capacity for future development along Andover Park East. <br />STATUS: Project will overlay Andover Park East from Strander Blvd to 1-405 in 2017. <br />MAINT. IMPACT: <br />COMMENT: Construction is scheduled for 2016 from Strander Blvd to Tukwila Parkway. <br />FINANCIAL Through Estimated <br />in $000's <br />2015 2016 2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />BEYOND TOTAL <br />EXPENSES <br />Pr.kject Location <br />V <br />°, � � T <br />Q 1' 0 <br />Alio.. <br />' ,r," <br />G 1J <br />91I <br />, <br />4 <br />Design <br />47 <br />43 <br />ft r'.1.. '1‘ <br />1 <br />�,�.Y <br />90 <br />Land (RM/) <br />�Ifar9p <br />1 <br />0 <br />Const. Mgmt. <br />,-J <br />� <br />206 <br />50 <br />'* <br />E <br />E 141 <br />s <br />256 <br />Construction <br />�9_'2 <br />1,626 <br />500 <br />%/;aY <br />1:f Gy <br />1 <br />I <br />l.° % a <br />titgf _ <br />2,126 <br />TOTAL EXPENSES <br />47 <br />1,875 <br />550 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />2,472 <br />FUND SOURCES <br />Awarded Grant <br />0 <br />Proposed PWTF/Bond <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />290 <br />290 <br />Utility Revenue <br />47 <br />1,585 <br />550 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />2,182 <br />TOTAL SOURCES <br />47 <br />1,875 <br />550 <br />0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />2,472 <br />2017 - 2022 Capital Improvement Program <br />77 <br />53 <br />Pr.kject Location <br />V <br />°, � � T <br />Q 1' 0 <br />Alio.. <br />' ,r," <br />G 1J <br />91I <br />, <br />4 <br />ft r'.1.. '1‘ <br />1 <br />�,�.Y <br />�Ifar9p <br />1 <br />,-J <br />� <br />d <br />.+MroHJ <br />'* <br />E <br />E 141 <br />s <br />�\I <br />6,045_,11:42 <br />�9_'2 <br />%/;aY <br />1:f Gy <br />1 <br />I <br />l.° % a <br />titgf _ <br />I <br />, <br />GIS <br />2017 - 2022 Capital Improvement Program <br />77 <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.