City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-04-23 Item 2C - Contract Supplement #1 - 2018 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-04-23 Transportation and Infrastructure
>
TIC 2018-04-23 Item 2C - Contract Supplement #1 - 2018 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:59 PM
Creation date
4/19/2018 3:58:40 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/23/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-1 <br />engineering expertise outside of the capabilities of the Consultant. <br />• Services will be performed in accordance with the Contract plans & special provisions, and City <br />engineering standards. <br />II. SCOPE OF WORK <br />The objective and purpose of this Construction Management Services Agreement is for the Consultant <br />to successfully deliver the construction of the Project to the City by ensuring that the improvements are <br />constructed in accordance with the approved Plans and Specifications, as may be amended or revised, <br />that all of the required Project documentation is accounted for. <br />TASK 1— MANAGEMENT/COORDINATION/ADMINISTRATION <br />Provide overall project management, coordination with the City, monthly progress reports, and <br />invoicing. This effort will include the following elements. <br />• Organize and layout work for project staff. Prepare project instructions on contract <br />administration procedures to be used during construction. <br />• Review monthly expenditures and CM team scope activities. Prepare and submit project <br />progress letters to the City along with invoices describing CM services provided each month. <br />Prepare and submit reporting required by funding source(s), if any. <br />Deliverables <br />• Monthly invoices and progress reports <br />TASK 2 — PRECONSTRUCTION SERVICES <br />2.1 Preconstruction Conference: The Consultant will prepare an agenda for, distribute notices of, <br />and conduct a preconstruction conference in the City's offices. The Consultant's project <br />manager, resident engineer, inspector, and document control specialist will attend the <br />preconstruction conference. The Consultant will prepare a written record of the meeting and <br />distribute copies of the minutes to all attendees and affected agencies, staff, etc. <br />At the Pre -construction conference, the Consultant shall facilitate discussions with the <br />Contractor concerning the plans, specifications, schedules, issues with utilities, unusual <br />conditions, Federal, State, and local requirements and any other items that will result in better <br />project understanding among the parties involved. <br />Deliverables <br />• Preconstruction conference agenda with meeting minutes <br />TASK 3 — CONSTRUCTION SERVICES - FIELD <br />3.1 On-site Observation: The Consultant shall provide the services of one full time inspector <br />during construction activities and other tasks necessary to monitor the progress of the work. An <br />additional inspector, may be incorporated as dictated by the Contractor's approach to the Work. <br />Construction staff shall oversee the following items of work, on the project site, and will observe <br />the technical progress of the construction, including providing day-to-day contact with the <br />City of Tukwila — 2018 Overlay Program <br />Construction Management Services <br />Scope of Work <br />Page 3 of 7 <br />KPG <br />Project Number 17135 <br />4/10/2018 <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.