Laserfiche WebLink
EXHIBIT A-1 <br />Contractor and the City: <br />o Preparation to include mobilization and clearing and grubbing <br />o Erosion Control <br />o HMA grinding and paving <br />o Driveways, curb, gutter and sidewalk <br />o And all incidental items necessary to complete the Work as described in the Plans <br />and/or Specifications. <br />Field inspection staff will perform the following duties as a matter of their daily activities: <br />Observe technical conduct of the construction, including providing day-to-day contact <br />with construction contractor, City, utilities, and other stakeholders, and monitor for <br />adherence to the Contract Documents. The Consultant's personnel will act in <br />accordance with Sections 1-05.1 and 1-05.2 of the Standard Specifications. <br />ii. Observe material, workmanship, and construction areas for compliance with the <br />Contract Documents and applicable codes, and notify construction contractor of <br />noncompliance. Advise the City of any non -conforming work observed during site visits. <br />iii. Document all material delivered to the job site in accordance with the contract <br />documents. <br />iv. Prepare daily inspection reports, recording the construction contractor's operations as <br />actually observed by the Consultant; includes quantities of work placed that day, <br />contractor's equipment and crews, and other pertinent information. <br />v. Interpret Contract Documents in coordination with the City and KPG. <br />vi. Resolve questions which may arise as to the quality and acceptability of material <br />furnished, work performed, and rate of progress of work performed by the construction <br />contractor. <br />vii. Establish communications with adjacent property owners. Respond to questions from <br />property owners and the general public. <br />viii. Coordinate with permit holders on the Project to monitor compliance with approved <br />permits, if applicable. <br />ix. Prepare field records and documents to help assure the Project is administered in <br />accordance with the funding requirements. <br />x. Collect and calculate delivery tickets and salesman's daily reports of aggregate. All <br />tickets will be initialed with correct bid item and stationing identified (Construction <br />Manual 10-2). <br />xi. Attend and actively participate in regular on-site weekly construction meetings. <br />xii. Take periodic digital photographs during the course of construction, and record <br />locations. <br />xiii. Coordinate with the City's maintenance personnel. <br />xiv. Punch list. Upon substantial completion of work, coordinate with the Client and <br />affected agencies, to prepare a 'punch list' of items to be completed or corrected. <br />Coordinate final inspection with those agencies. <br />City of Tukwila — 2018 Overlay Program Page 4 of 7 KPG <br />Construction Management Services Project Number 17135 <br />Scope of Work 4/10/2018 <br />14 <br />