City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-04-23 Item 2C - Contract Supplement #1 - 2018 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-04-23 Transportation and Infrastructure
>
TIC 2018-04-23 Item 2C - Contract Supplement #1 - 2018 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:59 PM
Creation date
4/19/2018 3:58:40 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/23/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBITA-1 <br />• Final Project Documents <br />TASK 3.5 — SUBMITTAL/RFI PROCESSING <br />A. Submittals: Coordinate review process for shop drawings, samples, traffic control plans, test <br />reports, and other submittals from the Contractor for compliance with the contract documents. <br />Key submittals to be transmitted to the City for their review and approval. Submittals shall be <br />logged and tracked. <br />B. Request for Information (RFI): Review and respond to RFI's. RFI's shall be logged and tracked. <br />C. Record of Materials (ROM): Utilize ROM prepared by KPG and update based on Special <br />Provisions and Plans for use on the project, based on the contract specifications. The ROM will be <br />maintained by the Resident Engineer. The ROM will track all of the materials delivered to the site <br />including manufacturer/supplier, approved RAM's, QPL items, material compliance <br />documentation, and all other required documentation. <br />Deliverables <br />• Submittal log <br />• RFI Log <br />• Completed Record of Material for Material Certification <br />TASK 3.6 — CHANGE MANAGEMENT <br />A. Case Log: Develop and maintain a case log which includes change orders, RFP's, Field Work <br />Directives <br />B. Change Orders: Develop change orders and provide technical assistance to negotiate change orders, <br />and assist in resolution of disputes which may occur during the course of the project. Each change <br />order will be executed in accordance with WSDOT Standard Specifications and contain the <br />following: <br />• Change order <br />• Independent Cost Estimate <br />• Time Impact Analysis <br />• Contractor's Pricing <br />• Verbal Approval Memo <br />• Back up documentation <br />C. Field Work Directives: Prepare field work directives as necessary to keep the contractor on <br />schedule. <br />D. Minor Change Orders: Develop minor change orders per WSDOT Standard Specifications. Each <br />minor change order will be executed and contain the following: <br />• Independent Cost Estimate <br />• Verbal Approval Memo <br />• Backup documentation <br />E. Force Account: Track contractor force account labor, equipment and materials. All force account <br />calculations will be verified by the engineer and double checked by the documentation specialist. <br />Deliverables <br />City of Tukwila —2018 Overlay Program Page 7 of 7 KPG <br />Construction Management Services Project Number 17135 <br />Scope of Work 4/10/2018 <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.