City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-04-23 Item 2C - Contract Supplement #1 - 2018 Overlay and Repair Program Construction Management with KPG Inc
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-04-23 Transportation and Infrastructure
>
TIC 2018-04-23 Item 2C - Contract Supplement #1 - 2018 Overlay and Repair Program Construction Management with KPG Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:59 PM
Creation date
4/19/2018 3:58:40 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
04/23/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A-1 <br />D. Weekly Meetings: Lead weekly meetings, including preparation of agenda, meeting minutes, <br />and distribution of minutes to attendees. Outstanding issues to be tracked on a weekly basis. <br />E. Initial Schedule Review: Perform detailed schedule review of contractor provided CPM for <br />conformance with the contract documents. <br />F. Lump Sum Breakdown: Evaluate construction contractors' Schedule of Values for lump sum <br />items. Review the Contract Price allocations and verify that such allocations are made in <br />accordance with the requirements of the Contract Documents. Lump Sum Breakdowns for <br />payment each month will be calculated with detailed data. <br />G. Monthly Pay Requests: Prepare monthly requests for payment, review with the City, <br />contractor and approve as permitted. Utilize City provided format for pay estimates, or <br />Consultant format. <br />H. Monthly Schedule Review: At the monthly cutoff, review contractor's updated schedule and <br />compare with field -observed progress, as described in Section 1-08 of the Special Provisions. <br />In addition, perform schedule analysis on contractor provided CPM updates and review <br />schedule for delays and impacts. Coordinate with Contractor in the development of recovery <br />schedules, as needed, to address delays caused by either events or issues within the <br />Contractor's control or other events or issues beyond the Contractor's control. <br />I. Certified Payroll: Process and track all certified payroll per State Prevailing Wage <br />Requirements. This includes verifying the initial payroll for compliance and 10% of all payrolls <br />submitted thereafter. Tracking payroll each week. <br />J. Weekly Statement of Working Days: Prepare and issue weekly statement of working day <br />report each week. <br />K. Subcontractor Documentation: Process / Approve all required subcontractor documentation. <br />Request to Sublets will be verified and logged. This includes checking System Award <br />Management System (SAMS), verifying business licensing, reviewing insurance documentation, <br />verifying city business licensing, Intent to Pay Prevailing Wage and Affidavit of Wages Paid. All <br />subcontractor documentation will be logged into KPG's subcontractor logs. <br />L. Record Drawings: Review record drawings prepared by the Contractor, and prepare a <br />conformed set of project record drawings based on Contractor provided information and from <br />inspection notes. Record drawings to be verified on a monthly basis, as part of the progress <br />payment to the Contractor. Upon project completion, contractor provided markups will be <br />verified for completeness and supplemented with inspection information. The Consultant will <br />provide the marked up plan sheets with both the contractors and inspectors as -built <br />information. Revisions to the CAD drawings are not included <br />M. Physical Completion Letter: Following completion of all punchlist work, prepare physical <br />completion letter to the contractor, and recommend that City and/or Utilities accept the <br />project. <br />N. Project Closeout: Transfer all project documents to the City for permanent storage. <br />• Schedule review comments <br />• As -built schedule <br />• Meeting agendas and notes <br />• Monthly Pay Estimates <br />• Subcontractor Packets <br />• Cost Projection <br />• Physical Completion Letter <br />City of Tukwila — 2018 Overlay Program Page 6 of 7 KPG <br />Construction Management Services Project Number 17135 <br />Scope of Work 4/10/2018 <br />16 <br />