City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-14 Item 2A - Agreement - Strander Boulevard Extension Phase III: Utility Relocation Design Reimbursement with BP / Olympic Pipeline for $630,000
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2A - Agreement - Strander Boulevard Extension Phase III: Utility Relocation Design Reimbursement with BP / Olympic Pipeline for $630,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:59 PM
Creation date
5/9/2018 4:35:55 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A <br />SCOPE OF WORK <br />Description of Work <br />OPL will develop a design and plan to relocate its 14 -inch and 12 -inch petroleum pipelines in <br />interference with the Strander Boulevard Expansion Project in Tukwila, WA. This relocation <br />will accommodate the CITY's expansion of Strander Boulevard. As a result OPL's 12 -inch <br />and 14 -inch pipelines are impacted and will need to be relocated. <br />Under this Agreement, OPL will perform the following preliminary engineering design work <br />associated with the modification or relocation of its facilities. <br />Project Management <br />• Organize and develop work plan and advance design development. <br />• Provide guidance on private property coordination and legal review of any easement, <br />and coordinate with CITY on replacement easements and/or reciprocal conveyances. <br />• Procurement of engineering, surveying, and construction contractors. <br />• Track right of way document development. <br />• Coordinate with the CITY on the design and construction methods of the proposed <br />relocation so the CITY can proceed with the permitting. <br />Potholing/Soil Borings <br />• Pothole elevation of 12" and 14" pipelines upstream/upland tie-in location. <br />• Probe/confirm elevation of 20" pipeline downstream tie-in location. <br />• If sufficient subsurface soil and groundwater information is not available, complete <br />soil borings as necessary. <br />Survey Contractor <br />• Update topographic gaps from CITY -provided CADD and mapping information. <br />• Modify data for design development. <br />• Survey location of items during design phase engineering. <br />Modeling <br />• From updated field investigation, model proposed alignment for design development. <br />Design <br />• Design pipe relocation, bends, and length of pipe. <br />• Prepare right of way plan sheets. <br />• Identify laydown area and ingress and egress areas. <br />• Coordinate with mechanical contractor on constructability issues. <br />• Prepare plan view and profile of pipe relocation. <br />• Prepare contract specifications. <br />Geotechnical <br />• Review, evaluate, analyze, and plan for site geotechnical conditions that may impact <br />construction of the petroleum pipeline relocations. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.