TIC 2018-05-14 Item 2A - Agreement - Strander Boulevard Extension Phase III: Utility Relocation Design Reimbursement with BP / Olympic Pipeline for $630,000
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2A - Agreement - Strander Boulevard Extension Phase III: Utility Relocation Design Reimbursement with BP / Olympic Pipeline for $630,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:29:59 PM
Creation date
5/9/2018 4:35:55 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Permitting <br />• Washington State Department of Ecology (WSDOE) — NPDES Construction <br />Stormwater General Permit and approval of possible SEPA amendment <br />determination by City of Tukwila. <br />City of Tukwila - permits required by City code and after consultation with City staff, <br />which may include permits for right-of-way use and grading. Additionally, depending <br />on the scope of work, determine with City staff whether a SEPA amendment and/or <br />additional Critical Areas Review is required to complete Olympic's work. <br />Deliverable <br />• Plans, Specifications & Estimates (PS&E) for the petroleum pipeline relocation, which <br />will be utilized by OPL to procure the relocation's construction. <br />Schedule (Tentative) <br />• Survey, site reconnaissance, and potholing (if necessary) - 2nd & 3`d Quarters 2018. <br />• Engineering design 6 to 8 months; 2"d 3rd & 4th Quarters 2018. <br />• Permit package development & submittal — submittal date TBD. <br />Exhibit A Page 2 of 2 <br />11 <br />