City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-14 Item 2D - Agreement - Memorandum of Agreement with Seattle City Light / City of Seattle for Underground Electrical Distribution System Cost Sharing (53rd Avenue South Project)
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2D - Agreement - Memorandum of Agreement with Seattle City Light / City of Seattle for Underground Electrical Distribution System Cost Sharing (53rd Avenue South Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:00 PM
Creation date
5/9/2018 4:36:27 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Infrastructure Work. All Private Property Infrastructure work necessary for City <br />Light to complete its underground service connection work to those properties in <br />the Conversion Area will be completed by Tukwila, Tukwila's Consultants or <br />Contractors, or the private property owners per RCW 35.96.050 prior to Operational <br />Acceptance of the Civil Infrastructure by City Light. <br />6.2.3. City Light shall intercept and connect the service in the secondary handhole. The <br />contractor performing the Private Property Infrastructure Work shall coordinate <br />each service cutover work with the City Light electric service representative, five <br />(5) working days in advance of the cutover. <br />6.3 Aerial Infrastructure Removal Project: <br />6.3.1. City Light will perform the work necessary to complete the Aerial Infrastructure <br />Removal Project in accordance with the Project Schedule and as set forth in Section <br />4.3 of this Agreement. <br />6.3.2. City Light will coordinate with Tukwila and Tukwila's Contractor to schedule the <br />removal of the connections to the Tukwila streetlights at a mutually convenient time <br />and place. <br />6.3.3. Tukwila will, with the cooperation and assistance of City Light, coordinate the <br />removal of the Third -Party facilities on the Aerial Electrical System to coincide <br />with the removal of City Light overhead lines. City Light further agrees to <br />cooperate with Tukwila in exercising any lawful authority that City Light may have <br />to require such Third Parties to timely remove their facilities from the City Light <br />and jointly -owned poles within the Conversion Area. Upon request by Tukwila, <br />and to the extent legally permitted, City Light will provide Tukwila with copies of <br />pole attachment agreements, if any, between the Third Parties and City Light, and <br />any policies, procedures, rules, or regulations that are applicable to the exercise of <br />such authority. <br />6.3.4. City Light will be responsible for removing poles solely owned by City Light and <br />requesting removal of utility poles in joint ownership with a telecommunications <br />or other service provider. The telecommunication or other service provider shall <br />have primary responsibility for removal of the poles that are joint ownership poles <br />per City Light records. In the event that a Third Party does not remove such jointly - <br />owned poles, and upon the request of Tukwila, City Light will remove the poles <br />after all Third Parties have completed their wiring, service connections, and <br />removed their lines and equipment from the poles. Tukwila agrees that this is not a <br />project cost that is recoverable through City Light and will be done at Tukwila's <br />expense or as may be allocated pursuant to agreements between Tukwila and other <br />parties <br />6.3.5 City Light shall have the right to temporarily bypass any facilities that will be <br />temporarily disconnected, relocated, or removed. <br />6.4 Inspection: <br />City of Tukwila — 53rd Ave S Undergrounding Agreement <br />Page 11 of 17 <br />FINAL <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.