City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-05-14 Item 2D - Agreement - Memorandum of Agreement with Seattle City Light / City of Seattle for Underground Electrical Distribution System Cost Sharing (53rd Avenue South Project)
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-05-14 Transportation and Infrastructure
>
TIC 2018-05-14 Item 2D - Agreement - Memorandum of Agreement with Seattle City Light / City of Seattle for Underground Electrical Distribution System Cost Sharing (53rd Avenue South Project)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:00 PM
Creation date
5/9/2018 4:36:27 PM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
05/14/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Civil Infrastructure and will repair or replace any damaged structure at their expense, <br />unless such damage is caused by City Light. its contractors. or subcontractors. The <br />Contractor or its subcontractors will continue to complete the duct bank punch list, and <br />both Tukwila's Engineer and the City Light Inspector will continue to verify that the <br />open items are being completed. In accordance with Section 4.3.3 of this Agreement, <br />City Light will assume ownership and control of t h e Civil Infrastructure upon Final <br />Acceptance. <br />6.7 Street Lighting and Signals: City Light and Tukwila will select service points for the Street <br />Lighting System designed by Tukwila's Consultant. City Light will install wiring between <br />its power source and the service points and make final connections to energize the systems. <br />Tukwila's Contractor will provide temporary highway lighting as necessary during <br />construction. <br />6.8 Environmental Site Conditions. In the event that the Contractor, in performing the Work, <br />including but not limited to the Civil Infrastructure work, discovers any materials <br />that require special removal, treatment, handling, transport and/or disposal under any <br />local, state or federal laws or regulations (including, but not limited to hazardous materials, <br />hazardous waste, dangerous waste, toxic waste or contaminated soil or groundwater), the <br />costs for removal, treatment, handling, transporting and disposal of such materials shall <br />not be part of the Civil Infrastructure Costs, and shall be the responsibility of Tukwila. <br />However, City Light and Tukwila shall retain all rights they may have under applicable <br />state and federal laws to recover costs that either may incur related to the existence of such <br />hazardous materials, hazardous, dangerous, or toxic wastes, or contaminated soil or <br />groundwater from any and all parties that may be responsible for such materials, wastes, <br />or contamination discovered or uncovered during construction of the Civil Infrastructure. <br />Section 7. Financial <br />7.1. Allocation of Project Cost: <br />7.1.1. City of Tukwila shall pay for 100% of the Primary Project Cost, 100% of the <br />excavation and restoration costs, as well as 40% of the Civil Infrastructure and <br />Underground Electrical System project costs. <br />7.1.2. City Light shall reimburse the City of Tukwila for 60% of the Civil Infrastructure <br />and shall pay 60% of the Underground Electrical System project costs. <br />7.1.3. City Light will pay 100% of City Light's Project Management Costs. Tukwila <br />will pay 100% o f Tukwila's Project Management Costs. <br />7.1.4. Private property owners will be responsible for providing the underground Private <br />Property Infrastructure, subject to review and approval by City Light, that is <br />needed to provide electrical service from the public right of way to the designated <br />service point on the private property, and all costs related to installing and <br />maintaining such Private Property Infrastructure. <br />7.1.5. The City of Tukwila will be responsible for providing the necessary funding for <br />City of Tukwila — 53rd Ave S Undergrounding Agreement <br />Page 13 of 17 32 <br />FINAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.