Laserfiche WebLink
Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />Hearing <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />00 <br />STP(E) <br />WA -11115 <br />Green River Trail <br />Green River Trail <br />Christensen Road to Green River <br />Replace the existing 8400t wide Green River Trail with 12400t wide concrete paved <br />trail with 2400t gravel shoulders, including illumination, CCTV, wayfinding, and <br />pedestrian plaza. <br />06/25/18 <br />07/02/18 <br />139,860 <br />1,036,000 <br />28 <br />896,140 <br />0.140 <br />DCE <br />No <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />CN <br />2021 <br />STP(E) <br />896.140 <br />0 <br />139,860 <br />1,036,000 <br />Totals <br />896,140 <br />0 <br />0 <br />139,860 <br />1,036,000 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />5th & 6th <br />CN <br />0 <br />0 <br />1,036,000 <br />0 <br />0 <br />Totals <br />0 <br />0 <br />1,036,000 <br />0 <br />0 <br />Report Date: May 17, 2018 <br />Page 11 <br />