Laserfiche WebLink
Agency: Tukwila <br />County: King <br />MPO/RTPO: PSRC <br />Y Inside <br />Six Year Transportation Improvement Program <br />From 2019 to 2024 <br />N Outside <br />Functional <br />Class <br />Priority Number <br />A. PIN/Project No. B. STIP ID <br />C. Project Title <br />D. Road Name or Number <br />E. Begin & End Termini <br />F. Project Description G. Structure ID <br />Hearing <br />Adopted <br />Amendment <br />Resolution No. <br />Improvement Type <br />Utility Codes <br />Total Length <br />Environmental Type <br />RW Required <br />17 <br />WA -11110 <br />Macadam Rd S Complete Streets Project <br />Macadam Road <br />S 150th Street to S 144th Street <br />Design and construction of a complete street on Macadam Road. Road widening <br />and rechannelization to add 5 -foot bike lanes and 5 -foot sidewalks on both sides of <br />the roadway. Includes illumination, curb, and storm drainage. <br />06/25/18 <br />07/02/18 <br />0 <br />397,369 <br />04 <br />RW <br />0.350 <br />DCE <br />No <br />Funding <br />Status <br />Phase <br />Phase Start Year (YYYY) <br />Federal Fund Code <br />Federal Funds <br />State Fund Code <br />State Funds <br />Local Funds <br />Total Funds <br />P <br />PE <br />2019 <br />0 <br />Ped/Bike Program <br />397,369 <br />0 <br />397,369 <br />P <br />RW <br />2019 <br />0 <br />0 <br />Ped/Bike Program <br />100,000 <br />0 <br />100,000 <br />P <br />CN <br />2020 <br />0 <br />0 <br />Ped/Bike Program <br />2,272,947 <br />460,000 <br />2,732,947 <br />Totals <br />0 <br />2,770,316 <br />460,000 <br />3,230,316 <br />Expenditure Schedule <br />Phase <br />1st <br />2nd <br />3rd <br />4th <br />5th & 6th <br />PE <br />397.369 <br />0 <br />0 <br />0 <br />0 <br />RW <br />100,000 <br />0 <br />0 <br />0 <br />0 <br />CN <br />0 <br />2,732,947 <br />0 <br />0 <br />0 <br />Totals <br />497,369 <br />2,732,947 <br />0 <br />0 <br />0 <br />Report Date: May 17, 2018 <br />Page 12 <br />