City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2018-07-02 Item 3D - Contract Supplement #1 - South 196th / 200th Street Bridge Repairs with TranTech Engineering for $20,000
COT-City
>
City Clerk
>
Council Agenda Packets
>
2018 Council Agenda Packets
>
2018-07-02 Regular
>
Reg 2018-07-02 Item 3D - Contract Supplement #1 - South 196th / 200th Street Bridge Repairs with TranTech Engineering for $20,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2018 8:30:26 AM
Creation date
6/29/2018 8:30:22 AM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
07/02/18
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Tukwila <br />City Council Transportation & Infrastructure Committee <br />TRANSPORTATION & INFRASTRUCTURE COMMITTEE <br />Meeting Minutes <br />June 25, 2018 - 5:30 p.m. - Hazelnut Conference Room, City Hall <br />Councilmembers: Thomas McLeod, Chair; De'Sean Quinn, Zak Idan <br />Staff: David Cline, Henry Hash, Hari Ponnekanti, Bruce Linton, Peter Lau, Gail <br />Labanara, Jaimie Reavis, Cyndy Knighton, Laurel Humphrey, Brandon Miles <br />Guests: Amy Pellegrini, AT&T; Abdirisak Ahmed, Abu Bakr Islamic Center <br />CALL TO ORDER: Committee Chair McLeod called the meeting to order at 5:30 p.m. <br />I. PRESENTATIONS <br />II. BUSINESS AGENDA <br />A. Grant Acceptance: West Valley Highway (1-405 to Strander Boulevard) <br />Staff is seeking Council approval to accept a Congestion Mitigation and Air Quality (CMAQ) grant <br />in the amount of $627,903 for the West Valley Highway (1-405 to Strander Boulevard) Project. <br />Funding will be used to design and construct a wide shared -use path on West Valley Highway from <br />the Longacres Way intersection south to the recently widened sidewalks next to the Tukwila <br />Urban Center Pedestrian Bridge. Funds will also be used to design future improvements on <br />Longacres Way between SR 181 to the Tukwila Sound Transit Link Station. The City's match will <br />come from impact fees, general fund, Fund 104, and other grant funding as shown in the proposed <br />revision to the Capital Improvement Program summary page. UNANIMOUS APPROVAL. <br />FORWARD TO JULY 2, 2018 REGULAR CONSENT AGENDA. <br />There was consensus to consider the Design Consultant Supplement with Tran Tech as the next order <br />of business. <br />B. Supplemental Agreement: Annual Bridge Inspections and Repairs <br />*Staff is seeking Council approval of Supplement No. 1 to Contract No. 18-056 with TranTech <br />Engineering in the amount of $20,000 for additional design of the South 196th/200th Street Bridge <br />repairs. A recent inspection revealed that settlement on the west end of the structure has <br />increased to three inches, and this supplement will adjust the contract scope to include remedy <br />of that issue. UNANIMOUS APPROVAL. FORWARD TO JULY 2, 2018 REGULAR CONSENT <br />AGENDA. <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.