City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
Reg 2018-07-02 Item 3D - Contract Supplement #1 - South 196th / 200th Street Bridge Repairs with TranTech Engineering for $20,000
COT-City
>
City Clerk
>
Council Agenda Packets
>
2018 Council Agenda Packets
>
2018-07-02 Regular
>
Reg 2018-07-02 Item 3D - Contract Supplement #1 - South 196th / 200th Street Bridge Repairs with TranTech Engineering for $20,000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2018 8:30:26 AM
Creation date
6/29/2018 8:30:22 AM
Metadata
Fields
Template:
Council Agenda Packets
Agenda Packets Date (mm/dd/yy)
07/02/18
Meeting Type
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF TUKWILA CAPITAL PROJECT SUMMARY <br />2017 to 2022 <br />PROJECT: Annual Bridge Inspections and Repairs Project No. 9XX10402 <br />DESCRIPTION: Ongoing program of bi-annual inspections, repairs, painting and rehabilitation of the 22 City bridges. <br />Federally required program identifies safety or repair needs in the early stages to minimize hazards and <br />JUSTIFICATION: costs. The number of bridge inspections necessary each year can vary year to year. Inspection frequencies <br />vary from bridge to bridge and King County has provided some inspection services. <br />STATUS: Construction projects will be determined from inspection reports and noted deficiencies/problems. <br />MAINT. IMPACT: Reduces maintenance costs. <br />COMMENT: Ongoing project, only one year actuals are shown in the first column. <br />FINANCIAL Through Estimated <br />in $000's <br />2015 2016 2017 <br />2018 <br />2019 <br />2020 <br />2021 <br />2022 <br />BEYOND TOTAL <br />EXPENSES <br />Design <br />79 <br />40 <br />40 <br />45 <br />45 <br />45 <br />55 <br />55 <br />55 <br />459 <br />Land (R/VV) <br />0 <br />Const. Mgmt. <br />30 <br />30 <br />40 <br />40 <br />40 <br />50 <br />50 <br />50 <br />330 <br />Construction <br />118 <br />200 <br />200 <br />250 <br />250 <br />250 <br />300 <br />300 <br />300 <br />2,168 <br />TOTAL EXPENSES <br />197 <br />270 <br />270 <br />335 <br />335 <br />335 <br />405 <br />405 <br />405 <br />2,957 <br />FUND SOURCES <br />Awarded Grant <br />Proposed Grant <br />0 <br />Mitigation Actual <br />0 <br />Mitigation Expected <br />0 <br />City Oper. Revenue <br />197 <br />270 <br />270 <br />335 <br />335 <br />405 <br />405 <br />405 <br />2,957 <br />TOTAL SOURCES <br />197 <br />270 <br />270 <br />335 <br />335 <br />405 <br />405 <br />405 <br />2,957 <br />30 2017 - 2022 Capital Improvement Program <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.