The City has advertised for construction bids and entered into a contract with a <br />Contractor reasonably acceptable for the parties for the construction of a joint utility trench <br />which shall include CenturyLink Facilities, Comcast, and SCL power facilities. This joint utility <br />trench will be placed within the northbound lane of 53rd Ave. S. between S. 137th and S. 144th <br />St. in accordance with the Project plans. <br />2. CONTRACTOR REQUIREMENTS <br />The independent contractor hired solely by the City to perform the work outlined in <br />Section 1 shall be referred to as "the Contractor" in this Agreement. The Contractor, pursuant to <br />a contract with the City, shall, as more fully detailed below, excavate the trench and install <br />CenturyLink Facilities, Comcast, and SCL power facilities, accommodate and coordinate the <br />installation of CenturyLink Facilities, install the bedding material, backfill and compact the <br />trench, and perform any restoration required by the City, all to be performed in a good and <br />workmanlike manner consistent with industry standards. The City represents that any such <br />contract shall further require of Contractor that the work be conducted in conformity with (i) the <br />applicable procedures and requirements of the parties as described herein; (ii) all applicable laws, <br />ordinances and regulations of any governmental authority, and; (iii) all applicable terms and <br />provisions of the National Electric Safety Code, as may be amended, supplemented or replaced <br />from time to time, including but not limited to those pertaining to protection and separation of <br />conductors buried in earth. <br />3. RESPONSIBILITY OF THE PARTIES <br />A. Drawings. CenturyLink shall provide engineering drawings, specifications, <br />construction standards, estimated material quantities, and cost estimates to the City for the <br />underground relocation of CenturyLink's Facilities. The drawings shall show in detail the <br />location and elevation of the conduits, trench, and vaults, and shall include a general traffic <br />control plan for activities not associated with installation of Facilities within the Contractor - <br />controlled open trench area. <br />B. Installation. CenturyLink shall furnish its conduit for installation by the <br />Contractor in the City -provided trench and shall furnish and deliver to the site all vaults for <br />installation by the Contractor in a timely manner as outlined in subsection 3.D. CenturyLink <br />shall furnish and install, with CenturyLink's own contractor, the CenturyLink copper cabling. <br />CenturyLink shall schedule all deliveries and work so as not to delay the Contractor. All rights, <br />title and interest in CenturyLink Facilities and associated equipment shall at all times remain <br />with CenturyLink. Parties hereto acknowledge and agree that CenturyLink shall in no event be <br />required to remove its respective, affected and abandoned facilities, prior to completion of its <br />underground Facilities, in accordance with this Agreement, as long as said installation is <br />completed in conformity with this Agreement. The City, by entering into this Agreement, is <br />granting CenturyLink a license to occupy the joint trench and public right-of-way in which the <br />Facilities will be placed, in accordance with any applicable franchise agreement or equivalent <br />JOINT TRENCH AGREEMENT— Page 2 of 11 (August 20, 2018) <br />(between City of Tukwila and CenturyLink Re: 53rd Ave S. project) <br />3 <br />