City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-09-10 Item 2F - Contract Supplement #1 - 2018 Annual Small Drainage Program Construction Management with KPG
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-09-10 Transportation and Infrastructure
>
TIC 2018-09-10 Item 2F - Contract Supplement #1 - 2018 Annual Small Drainage Program Construction Management with KPG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:07 PM
Creation date
9/6/2018 11:40:26 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/10/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HOUR AND FEE ESTIMATE <br />Project: City of Tukwila <br />2018 Small Drainage Program <br />Construction Services <br />1 - Management and Administration (Estimated duration 16 weeks) <br />Weekly level of effort by Classification <br />0.25 <br />0 <br />EXHIBIT B <br />0 <br />0 <br />0 <br />0 <br />0.25 <br />0 <br />Per <br />t Atchitc.xt,t. • <br />tv.dxatx Architmturo <br />• ci.-it t_nginc.,ring • <br />Preconstruction Budget Estimate <br />2 - Preconstruction Services (Estimated duration 2 weeks) <br />Weekly level of effort by Classification <br />4 <br />O <br />0 <br />2 <br />0 <br />2 <br />0 0 <br />1 0 <br />0 <br />0 <br />4 <br />8 <br />0 <br />0 <br />1,256.00 <br />Preconstruction Budget Estimate <br />3 - Construction Services (Estimated duration 12 weeks) <br />Weekly level of effort by Classification <br />O <br />O <br />4 <br />8 <br />4 <br />2 <br />2 0 <br />0 0 <br />0 <br />0 <br />16 <br />0 <br />16 0 <br />3,296.00 <br />Construction Period Budget Estimate <br />0 <br />96 <br />24 0 0 <br />192 0 $ 38,208.00 <br />4 - Closeout/Record Dwg Services (Estimated duration 2 weeks) <br />Weekly level of effort by Classification <br />O 4 <br />2 <br />4 <br />4 <br />0 8 <br />0 <br />Closeout / Record Dwg Budget Estimate <br />O 8 <br />4 <br />8 <br />8 <br />0 16 <br />0 <br />$ 5,520.00 <br />Reimbursables & Subconsultants <br />Material Testing Allowance $ <br />Mileage $ <br />Structural Shop Drawing Review $ <br />3,200.00 <br />1,000.00 <br />5,000.00 <br />itiVISQF t e\\ <br />8/27/2018 <br />\I E.. \.3 <br />