City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-09-10 Item 2F - Contract Supplement #1 - 2018 Annual Small Drainage Program Construction Management with KPG
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-09-10 Transportation and Infrastructure
>
TIC 2018-09-10 Item 2F - Contract Supplement #1 - 2018 Annual Small Drainage Program Construction Management with KPG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:07 PM
Creation date
9/6/2018 11:40:26 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/10/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />logged and tracked. <br />B. Request for Information (RFI): Review and respond to RFI's. RFI's shall be logged and tracked. <br />C. Record of Materials (ROM): Prepare ROM based on Special Provisions and Plans for use on the <br />project, based on the contract specifications. The ROM will be maintained by the Resident <br />Engineer. The ROM will track all of the materials delivered to the site including <br />manufacturer/supplier, approved RAM's, QPL items, material compliance documentation, and <br />all other required documentation. <br />Deliverables <br />• Submittal log <br />• RFI Log <br />• Completed Record of Material for Material Certification <br />TASK 4.3 — CHANGE MANAGEMENT <br />A. Case Log: Develop and maintain a case log which includes change orders, RFP's, Field Work <br />Directives <br />B. Change Orders: Develop change orders and provide technical assistance to negotiate change orders, <br />and assist in resolution of disputes which may occur during the course of the project. Each change <br />order will be executed in accordance with WSDOT Standard Specifications and contain the following: <br />• Change order <br />• Independent Cost Estimate <br />• Time Impact Analysis <br />• Contractor's Pricing <br />• Verbal Approval Memo <br />• Back up documentation <br />C. Field Work Directives: Prepare field work directives as necessary to keep the contractor on schedule. <br />D. Minor Change Orders: Develop minor change orders per WSDOT Standard Specifications. Each <br />minor change order will be executed and contain the following: <br />• Independent Cost Estimate <br />• Verbal Approval Memo <br />• Back up documentation <br />E. Force Account: Track contractor force account labor, equipment and materials. All force account <br />calculations will be verified by the engineer and double checked by the documentation specialist. <br />Deliverables <br />• Change Order(s) <br />• Case Management Log <br />• RFI Log <br />• Minor Change Order(s) <br />• Force Account Records <br />2018 Small Drainage Program Page 7 KPG <br />Construction Management Services 8/15/18 <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.