City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-09-10 Item 2F - Contract Supplement #1 - 2018 Annual Small Drainage Program Construction Management with KPG
COT-City
>
City Clerk
>
Council Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-Present)
>
2018-09-10 Transportation and Infrastructure
>
TIC 2018-09-10 Item 2F - Contract Supplement #1 - 2018 Annual Small Drainage Program Construction Management with KPG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:07 PM
Creation date
9/6/2018 11:40:26 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
09/10/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A <br />items. Review the Contract Price allocations and verify that such allocations are made in <br />accordance with the requirements of the Contract Documents. Lump Sum Breakdowns for <br />payment each month will be calculated with detailed data. <br />G. Monthly Pay Requests: Prepare monthly requests for payment, review with the City, <br />contractor and approve as permitted. Utilize City provided format for pay estimates, or <br />Consultant format. <br />H. Monthly Schedule Review: At the monthly cutoff, review contractor's updated schedule and <br />compare with field -observed progress, as described in Section 1-08 of the Special Provisions. <br />In addition, perform schedule analysis on contractor provided CPM updates and review <br />schedule for delays and impacts. Coordinate with Contractor in the development of recovery <br />schedules, as needed, to address delays caused by either events or issues within the <br />Contractor's control or other events or issues beyond the Contractor's control. <br />Certified Payroll: Process and track all certified payroll per State Prevailing Wage <br />Requirements. This includes verifying the initial payroll for compliance and 10% of all payrolls <br />submitted thereafter. Tracking payroll each week. <br />J. Weekly Statement of Working Days: Prepare and issue weekly statement of working day <br />report each week. <br />K. Subcontractor Documentation: Process / Approve all required subcontractor documentation. <br />Request to Sublets will be verified and logged. This includes checking System Award <br />Management System (SAMS), verifying business licensing, reviewing insurance <br />documentation, verifying city business licensing, Intent to Pay Prevailing Wage and Affidavit of <br />Wages Paid. All subcontractor documentation will be logged into KPG's subcontractor logs. <br />▪ Record Drawings: Review record drawings prepared by the Contractor, and prepare a <br />conformed set of project record drawings based on Contractor provided information and from <br />inspection notes. Rccord drawings to bc verified on a monthly basis, as part of thc progress <br />payment to thc Contractor. Upon project completion, contractor provided markups will bc <br />verified for completeness and supplemented with inspection information. The City will provide <br />the marked up plan sheets with both the contractors and inspectors as -built information. <br />Revisions to the CAD drawings will be based on these construction records. <br />M. Physical Completion Letter: Following completion of all punchlist work, prepare physical <br />completion letter to the contractor, and recommend that City and/or Utilities accept the <br />project. <br />N. Project Closeout: Transfer all project documents to the City for permanent storage. <br />• Schedule review comments <br />• Meeting agendas and notes <br />• Monthly Pay Estimates <br />• Subcontractor Packets <br />• Cost Projection <br />• Physical Completion Letter <br />• Final Project Documents <br />TASK 4.2 — SUBMITTAL/RFI PROCESSING <br />A. Submittals: Coordinate review process for shop drawings, samples, traffic control plans, test <br />reports, and other submittals from the Contractor for compliance with the contract documents. <br />Key submittals to be transmitted to the City for their review and approval. Submittals shall be <br />2018 Small Drainage Program Page 6 KPG <br />Construction Management Services 8/15/18 <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.