Laserfiche WebLink
4L;HMJILN;NCIH DZ )H@L;MNLO=NOL? #IGGCNN?? -CHON?MȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚȚ3?JN?G<?L dzDzțǴDzdzǺ <br /> <br />C. Grant Acceptance: Stormwater Quality Retrofit Project <br />Staff is seeking Council approval of a grant agreement with the Washington State Department <br />of Ecology (DOE) in the amount of $287,500.00 for the Stormwater Quality Retrofit Project. <br />This project will select seven candidate sites for water quality retrofits and advance up to four <br />projects to 90% design. The 15% required City match will come from Surface Water funds with <br />$115,000 currently budgeted in 2019. Councilmember Quinn reiterated his request to expand <br />the memo to better define the Surface Water fund. UNANIMOUS APPROVAL. FORWARD TO <br />SEPTEMBER 17, 2018 REGULAR CONSENT AGENDA. <br /> <br />D. Contract Amendment: Riverton Creek Flapgate Removal Project <br />Staff is seeking Council approval of Amendment 2 to Contract 17-070 in the amount of <br />$37,064.00 with OTAK, Inc. for the Riverton Creek Flapgate Removal Project. The project will <br />remove two culverts and flap gates and replace a section of at-grade trail with a bridge over <br />the restored open channel. The proposed amendment will incorporate current <br />recommendations into final design and bid documents and will bring the total contract <br />amount to $182,420. The amendment will be funded through remaining 2018 surface water <br />design funds and the 2019 design budget, then be partially or wholly reimbursed through the <br />2017 Salmon Recovery Funding Board design and construction grant. Councilmember Idan <br />asked if any projects would go unfunded as a result, and staff replied there is adequate budget <br />for other planned projects. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 17, 2018 <br />REGULAR CONSENT AGENDA. <br /> <br />E. Project Completion: 2017 Small Drainage Program <br />Staff is seeking Council approval of project completion and release of retainage to McCann <br />Construction, Inc. in the amount of $448,471.71 for the 2017 Annual Small Drainage Program. <br />th <br />Drainage improvements were installed at three locations: 48 Avenue South between South <br />thndth <br />160 Street and South 162 Street, Strander Boulevard sidewalk in front of Target, and 58 <br />Avenue South, 14423 to 14455. The project was physically completed on January 16, 2018 and <br />concluded under budget. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 17, 2018 <br />REGULAR CONSENT AGENDA. <br /> <br />F. Supplemental Agreement: 2018 Annual Small Drainage Program <br />Staff is seeking Council approval of Supplement No. 1 to Contract No. 18-063 with KPG, Inc. in <br />the amount of $57,480.00 for construction management services for the 2018 Small Drainage <br />Program. This is an extension of the design engineering services contract already executed <br />with KPG. To save money, staff will be doing more of the inspection work rather than <br />contracting it out. UNANIMOUS APPROVAL. FORWARD TO SEPTEMBER 17, 2018 REGULAR <br />CONSENT AGENDA. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />