City of Tukwila
My WebLink
|
Help
Search Tips
|
About
|
Sign Out
Browse
Search
TIC 2018-11-13 COMPLETE AGENDA PACKET
COT-City
>
City Clerk
>
City Council Committees Meetings
>
Previous Committees
>
Transportation and Infrastructure (2017-2020)
>
Transportation and Infrastructure Agenda Packets (2017-2020)
>
2018 Transportation and Infrastructure Packets
>
2018-11-13 Transportation and Infrastructure
>
TIC 2018-11-13 COMPLETE AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2021 12:30:10 PM
Creation date
11/8/2018 9:34:11 AM
Metadata
Fields
Template:
Council Committees
Committees Date (mm/dd/yy)
11/13/18
Committee Name
Transportation and Infrastructure 2017-2020
Record Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6 of 12 <br />Item <br />No. <br />Schedule A <br />Desc <br />Quantity <br />Std. Item <br />No. <br />Item Description <br />Unit <br />Unit <br />Cost <br />Schedule A <br />Dose <br />Cost <br />Schedule B <br />Dose <br />Cost <br />Schedule C <br />Dose <br />Cost <br />Total <br />All Schedules <br />96 <br />51,330 <br />4149 <br />ST. REINF. BAR FOR BRIDGE <br />LB. <br />$ 1 <br />$ 61,596 <br />$ - <br />$ - <br />$ 61,596 <br />97 <br />6,100 <br />XX-28 <br />ST. REINFORCED FOR WALL IMPROVEMENTS <br />LB <br />$ 1 <br />$ 7,320 <br />$ - <br />$ - <br />$ 7,320 <br />98 <br />260 <br />4322 <br />CONC. CLASS 4000 FOR BRIDGE <br />C.Y. <br />$ 400 <br />$ 104,000 <br />$ - <br />$ - <br />$ 104,000 <br />99 <br />7,460 <br />7006 <br />STRUCTURE EXCAVATION CLASS B INCL. HAUL <br />C.Y. <br />$ 24 <br />$ 179,040 <br />$ - <br />$ - <br />$ 179,040 <br />100 <br />750 <br />7008 <br />SHORING OR EXTRA EXCAVATION CLASS B <br />S.F. <br />$ 10 <br />$ 7,500 <br />$ - <br />$ - <br />$ 7,500 <br />101 <br />330 <br />XX-29 <br />4 FT DIAM PRIMARY SHAFT <br />LF <br />$ 720 <br />$ 237,600 <br />$ - <br />$ - <br />$ 237,600 <br />102 <br />330 <br />XX-30 <br />4 FT DIAM SECONDARY SHAFT <br />LF <br />$ 450 <br />$ 148,500 <br />$ - <br />$ - <br />$ 148,500 <br />103 <br />2 <br />4160 <br />QA SHAFT TEST <br />EACH <br />$ 2,000 <br />$ 4,000 <br />$ - <br />$ - <br />$ 4,000 <br />STRUCTURE - BNSF ROW <br />$ 1,894,436 <br />$ - <br />$ - <br />$ 1,894,436 <br />STRUCTURE - UPRR ROW <br />104 <br />13,120 <br />7006 <br />STRUCTURE EXCAVATION CLASS B INCL. HAUL <br />C.Y. <br />$ 24 <br />$ 314,880 <br />$ - <br />$ - <br />$ 314,880 <br />105 <br />10,890 <br />7008 <br />SHORING OR EXTRA EXCAVATION CLASS B <br />S.F. <br />$ 10 <br />$ 108,900 <br />$ - <br />$ - <br />$ 108,900 <br />106 <br />50 <br />4087 <br />CONSTRUCTING 6 FT. DIAM SHAFT <br />L.F. <br />$ 1,600 <br />$ 80,000 <br />$ - <br />$ - <br />$ 80,000 <br />107 <br />15,710 <br />4149 <br />ST. REINF. BAR FOR BRIDGE <br />LB. <br />$ 1 <br />$ 18,852 <br />$ - <br />$ - <br />$ 18,852 <br />\\fwfs1.abam.com\Projects_FW\FederalWay\2018W18.0085\00\Engineering\Cost Estimate\Ott Sakai Review\Cost Estimate_Ott Sakai Comparison_Enabled_rlf.xlsx 7/9/2018 <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.